My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-06-24
CITY-OF-BATESVILLE
>
City Clerk
>
Minutes
>
2008
>
2008-06-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2016 3:13:02 PM
Creation date
6/2/2016 3:13:01 PM
Metadata
Fields
Template:
City Clerk
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Councilmember Smart moved to honor the agreement and allow the hookups. <br /> Councilmember Carpenter seconded and all voted for. <br /> C) BECKY REGAN REGARDING SEWER PROBLEMS IN HER HOME <br /> Ms. Becky Regan addressed the council regarding sewer problems in her <br /> home. She lives at 2015 Carol Street and on Thanksgiving Day, 2007, she said <br /> her sewer backed up in her bathroom which resulted in her having to replace the <br /> carpet in her hall. Because of the holiday it was a few days before she could get <br /> a plumber to her home. Ms. Regan said in March 2008, the city came and <br /> replaced the sewer line and fixed the problem. She had two estimates to repair <br /> her bathroom, the least one being $1,800.00 and asked the city to pay for the <br /> damages. Sewer construction supervisor Red Davis addressed the council and <br /> said he had a few call on Carol Street and the line that was replaces was a <br /> service line belonging to the home owner not the City's main line. He said the <br /> main line had been checked and it was clear. City Engineer Damon Johnson <br /> said the houses on Carol Street were all built about the same time and probably <br /> the lines were all beginning to deteriorate. Before approving Ms. Regan's <br /> request, council asked Mr. Davis and Mr. Johnson to investigate the problem and <br /> determine if it is a City or homeowner problem. <br /> D) ENGINEER'S REPORT <br /> City Engineer Damon Johnson gave his scheduled report to the council. <br /> He said the Wastewater Treatment Plant had the annual ADEQ inspection. He <br /> said the plant was out of permit on one occasion due to rain and there were no <br /> violations. The last two new filters at the Water Treatment Plant should be <br />
The URL can be used to link to this page
Your browser does not support the video tag.