Laserfiche WebLink
****CONSIDER CONTRACT FOR SEWER SYSTEM I AND I STUDIES <br /> Mayor Elumbaugh told the council that the engineering firm of McGoodwin, <br /> Williams and Yates were in the process of conducting Sewer System Infiltration Studies <br /> and a contract needed to be signed in order to proceed. The study, among other things, <br /> monitors flows during both dry and rainfall periods. They have strategically placed 14 <br /> flow monitors and 4 rain gage monitors around Batesville. The Mayor asked the council <br /> for authority to sign the contract with McGoodwin, Williams and Yates for the sewer <br /> system studies. Councilmember McDonald so moved and Councilmember Matthews <br /> seconded. All voted for. <br /> ****CONSIDER CONTRACT FOR ST. LOUIS STREET WIDENING <br /> Mayor Elumbaugh said the second contract with McGoodwin, Williams and Yates <br /> is for the engineering services for preliminary planning and final design for the proposed <br /> water and sewer relocation project on St. Louis Street. Mr. Mayor said these expenses <br /> are supposed to be reimbursed by the State of Arkansas. Councilmember Shetron <br /> moved for the Mayor to sign the contract and Councilmember Carpenter seconded. All <br /> voted for. <br /> ****DISCUSS CORE DRILLING ACROSS MUNICIPAL GOLF COURSE FOR <br /> POSSIBLE GRAVITY FLOW MAIN SEWER TUNNEL <br /> Councilmember Shetron moved to table the discussion of the core drilling. <br /> Councilmember Krug seconded and all voted for. <br /> ****CONSIDER APPLYING FOR THE CLEAN WATER REVOLVING LOAN <br /> PROGRAM <br />