Laserfiche WebLink
SECTION 6 : In the event of the remodeling or enlarging of <br /> any business , industry, or other user already connected with <br /> such sanitary sewer system, or change of condition resulting in <br /> more water and sewage flowing into said sewer systems from such <br /> business, industry, or other user already connected, additional <br /> connection fees may be charged and collected in an amount <br /> thereof to be fixed and determined in the same manner. <br /> SECTION 7 : Connection fees provided herein shall apply to <br /> and be collected from all residences, businesses, industries, <br /> and other users which connect to any sewer or sewer system <br /> resulting in sewage passing through any part of said Big Pine <br /> Addition, Phase II Sewer Line provided for in this ordinance. <br /> SECTION 8 : No sewer connection shall be made without the <br /> consent of the City of Batesville nor shall such connection be <br /> made except upon inspection and approval by the City of <br /> Batesville, Arkansas. <br /> SECTION 9 : In the event any sewer connection is made <br /> resulting in sewage flowing through any part of said Big Pine <br /> Addition, Phase II Line without first obtaining permission to <br /> make such connection, the owner of the property served by such <br /> unauthorized connection of said sewer system shall pay a <br /> penalty of $25 .00 per day for each day of such occurrence in <br /> i <br /> addition to any fees imposed by any other ordinance of the City <br /> of Batesville. <br /> SECTION 10 : If any part of this ordinance shall be held to <br /> G6 <br /> i <br />