My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-01-01
CITY-OF-BATESVILLE
>
City Clerk
>
Ordinances
>
1993
>
1993-01-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2016 2:06:51 PM
Creation date
6/3/2016 2:06:03 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 15 <br /> 4 . 2 Wastewater Discharge Permit Requirement <br /> ® A. It shall be unlawful for any significant industrial user to <br /> discharge wastewater into the Batesville POTW without first <br /> obtaining a wastewater discharge permit from the Manager. <br /> Any violation of the terms and conditions of a wastewater <br /> discharge permit shall be deemed a violation of this <br /> ordinance and subjects the wastewater discharge permittee to <br /> the sanctions set out in Sections 10-12 . Obtaining a <br /> wastewater discharge permit does not relieve a permittee of <br /> its obligation to comply with all Federal and State <br /> pretreatment standards or requirements or with any other <br /> requirements of Federal, State and local law. <br /> B. The Batesville Utilities Commission may require other <br /> industrial users, including liquid waste haulers, to obtain <br /> wastewater discharge permits as necessary to carry out the <br /> purposes of this ordinance. <br /> 4 . 3 Wastewater Discharge Permitting Existing Connections <br /> Any significant industrial user which discharges industrial <br /> waste into the POTW prior to the effective date of this ordinance and <br /> who wishes to continue such discharges in the future, shall, within <br /> ninety (90) days after said date, apply to the Batesville Utilities <br /> Commission for a wastewater discharge permit in accordance with Section <br /> 4 . 6 below, and shall not cause or allow discharges to the POTW to <br /> continue after one hundred and twenty ( 120 ) days of the effective date <br /> of this ordinance except in accordance with a wastewater discharge <br /> permit issued by the Batesville Utilities Commission. <br /> 4 .4 Wastewater Discharge Permitting New Connections <br /> Any significant industrial user proposing to begin or recommence <br /> discharging industrial wastes into the POTW must obtain a wastewater <br /> discharge permit prior to the beginning or recommencing of such <br /> discharge. An application for this wastewater discharge permit must be <br /> filed at least Ninety ( 90 ) days prior to the date upon which any <br /> discharge will begin. <br /> 4 .5 Wastewater Discharge Permitting of Industrial Users Outside <br /> Municipal Boundaries <br /> A. Any existing significant industrial user located beyond the <br /> Batesville city limits shall submit a wastewater discharge <br /> permit application, in accordance with Section 4 . 6 below, <br /> within ninety ( 90 ) days of the effective date of this <br /> ordinance. New significant industrial users located beyond <br /> the Batesville city limits shall submit such applications to <br /> the Manager Ninety ( 90) days prior to any proposed discharge <br /> into the POTW. <br /> B. Alternately, the Batesville Utilities Commission may enter <br /> into an agreement with the neighboring jurisdiction in which <br /> the significant industrial user is located to provide for <br /> the implementation and enforcement of pretreatment program <br /> requirements against said industrial user. <br />
The URL can be used to link to this page
Your browser does not support the video tag.