My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-01-01
CITY-OF-BATESVILLE
>
City Clerk
>
Ordinances
>
1993
>
1993-01-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2016 2:06:51 PM
Creation date
6/3/2016 2:06:03 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 25 <br /> 6 . 2 Compliance Schedule Progress Report <br /> The following conditions shall apply to the schedule required by <br /> 6 . 1 (B) (7 ) . The schedule shall contain progress increments in the form <br /> of dates for the commencement and completion of major events leading to <br /> the construction and operation of additional pretreatment required for <br /> the user to meet the applicable pretreatment standards ( such events <br /> include: hiring an engineer, completing preliminary and final plans, <br /> executing contracts for major components, commencing and completing <br /> construction, beginning and conducting routine operation) . No <br /> increment referred to above shall exceed nine ( 9 ) months. The <br /> industrial user shall submit a progress report to the Manager no later <br /> than 14 days following each date in the schedule and the final date of <br /> compliance including, as a minimum, whether or not it complied with the <br /> increment of progress, the reason for any delay, (and, if appropriate) <br /> the steps being taken by the industrial user to return to the <br /> established schedule. In no event shall more than nine ( 9 ) months <br /> elapse between such progress reports to the Manager. <br /> 6 . 3 Report on Compliance with Categorical Pretreatment Standard <br /> Deadline <br /> Within ninety (90 ) days following the date for final compliance <br /> with applicable categorical pretreatment standards, or in the case of a <br /> new source following commencement of the introduction of wastewater <br /> into the POTW, any industrial user subject to such pretreatment <br /> standards and requirements shall submit to the Batesville Utilities <br /> Commission a report containing the information described in Section <br /> 6 . 1 (B) (4-6 ) . For industrial users subject to equivalent mass or <br /> concentration limits established in accordance with the procedures in <br /> 40 CFR 403 . 6 (c) , this report shall contain a reasonable measure of the <br /> industrial user's long term production rate. For all other industrial <br /> users subject to categorical pretreatment standards expressed in terms <br /> of allowable pollutant discharge per unit of production (or other <br /> measure of operation) , this report shall include the industrial user's <br /> actual production during the appropriate sampling period. All <br /> compliance reports must be signed and certified in accordance with <br /> Section 4 . 7 . <br /> 6 .4 Periodic Compliance Reports <br /> A. Any significant industrial user subject to any pretreatment <br /> standard shall, at a frequency determined by the Manager but <br /> in no case less than twice per year (in June and December) , <br /> submit a report indicating the nature and concentration of <br /> pollutants in the discharge which are limited by such <br /> pretreatment standards and the measured or estimated average <br /> and maximum daily flows for the reporting period. All <br /> periodic compliance reports must be signed and certified in <br /> accordance with Section 4 . 7 . However, where the POTW itself <br /> collects all the information required for the report, the <br /> Noncategorical Significant Industrial User will not be <br /> required to submit the report. <br />
The URL can be used to link to this page
Your browser does not support the video tag.