Laserfiche WebLink
on about August 15, 1989 shall be hereafter known as the Big <br /> Pine Addition, Phase I Sewer Line and the remainder of such <br /> sanitary sewer system including any and all sanitary sewer <br /> collection lines will empty into said Big Pine Addition, Phase I <br /> Sewer Line either directly or indirectly shall be known <br /> hereafter as Big Pine Addition, Phase I Sanitary Sewer <br /> Collection Lines. The plans and specifications for each and all <br /> of such lines shall be submitted to the Utilities Commission of <br /> the City of Batesville, Arkansas for approval and each and all <br /> of such sanitary sewer collection lines shall be constructed <br /> according to such plans and specifications under the supervision <br /> of the Batesville Utilities Commission„ <br /> Fees collected for sewer connection of said trunk line and for <br /> connections resulting from sewage passing through any part of <br /> said trunk line shall be paid to the Batesville Utilities <br /> Commission, until the full amount of construction costs of Big <br /> Pine Addition, Phase I Line have been fully paid; and all fees <br /> collected after that time shall be regulated by and shall belong <br /> to the Batesville Utilities Commission provided, however, no <br /> further connection fees shall ever be assessed against any <br /> single family residence for which fees for sewer connection as <br /> provided herein have been paid. <br /> SECTION 3: Upon approval of the plans and specifications <br /> and construction of the Big Pine Addition, Phase I sewer system, <br /> including the Big Pine Addition, Phase I Sewer Line and Sanitary <br /> Sewer Collection Lines including each and every sanitary sewer <br /> line hereafter connected with this system or connected so as to <br /> cause sewage to pass through any part of the system, the <br /> Batesville Utilities Commission shall accept the same for <br /> operation and maintenance and assume responsibility for and <br /> shall bear the costs and expense of operating and maintaining <br /> said Big Pine Addition, Phase I Sewer Line and each and all of <br />