My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
997
CITY-OF-BATESVILLE
>
City Clerk
>
Ordinances
>
1982
>
997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2019 9:22:21 AM
Creation date
8/8/2018 4:11:45 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
established. In no event shall more than 9 <br />months elapse between such progress reports <br />to the Manager. <br />(j) Each product produced by type, amount, process or <br />processes and rate of production; <br />(k) Type and amount of raw materials processed <br />i <br />(average and maximum per day); <br />(1) Number and type of employees, and hours of opera- <br />tion of plant and proposed or actual hours of <br />operation of pretreatment system; <br />(m) Any other information as may be deemed by the City <br />to be necessary to evaluate the permit application. <br />The City will evaluate the data furnished by the user and may <br />i <br />require additional information. After evluation and acceptance <br />of the data furnished, the City may issue a Wastewater Contribution <br />i <br />Permit subject to terms and conditions provided herein. <br />4.2.3 Permit Modifications. Within 9 months of <br />the promulgation of a National Categorical Pretreatment Standard, <br />i <br />the Wastewater Contribution Permit of Users subject to such <br />standards shall be revised to require compliance with such <br />r <br />standard within the time frame prescribed by such standard. Where <br />a user, subject to a National Categorical Pretreatment Standard, <br />i <br />has not previously submitted an application for a Wastewater <br />i <br />Contribution Permit as required by 4.2.2, the User shall apply for°! <br />a Wastewater Contribution Permit within 180 days after the <br />promulgation of the Applicable National Categorical Pretreatment <br />Standard. In addition, the User with an existing Wastewater <br />Contribution Permit shall submit to the Manager within 180 days <br />after the promulgation of an applicable Federal Categorical Pre- <br />treatment Standard the information required by paragraph (h) and <br />(i) of Section 4.2.2. <br />i <br />4.2.4 Permit Conditions. Wastewater Discharge <br />Permits shall be expressly subject to all provisions of this <br />- 19 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.