My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
722
CITY-OF-BATESVILLE
>
City Clerk
>
Ordinances
>
1966
>
722
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2019 2:05:15 PM
Creation date
8/23/2018 8:11:28 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
NEW - r/ <br />ORDINANCE NO. <br />AN ORDINANCE AUTHORIZING THE CONSTRUCTION <br />OF CERTAIN EXTENSIONS, BETTER4ENTS AND <br />IMPROVEMENTS TO THE WATER SYSTEM OF THE <br />CITY OF BATESVILLE, ARKANSAS; AUTHORIZING <br />THE ISSUANCE OF WATER SYSTEM REVENUE BONDS <br />FOR THE PURPOSE OF FINANCING A PORTION OF <br />THE COST OF SAID CONSTRUCTION; PROVIDING <br />FOR THE PAYMENT OF PRINCIPAL AND INTEREST <br />ON THE BONDS; PRESCRIBING OTHER MATTERS <br />RELATING THERETO; AND DECLARING AN EMERGENCY. <br />L ; <br />WHEREAS, the Water System (called/ "System") presently <br />serving the City of Batesville, Arkansas (called "City"), is <br />inadequate for the immediate needs of the inhabitants of the <br />City; and <br />WHEREAS, the City Council has determined that the <br />existing System should be improved and that certain extensions, <br />betterments and improvements thereto should be constructed; and <br />WHEREAS, the Council has had prepared by Max Mehlburger <br />Engineers, Consulting Engineers, a preliminary report and estimates <br />of cost of the needed extensions, betterments and improvements <br />(called "project"); and <br />WHEREAS, the said plans and estimates have been examined <br />and approved by the City Council and a copy thereof is on file in <br />the office of the City Clerk, where it may be inspected by any <br />interested person; and <br />WHEREAS, a brief general description of the project is <br />as follows: Construction of raw water river intake, pump station, <br />booster pump station, transmission line to plant site, feeder mains, <br />elevated storage tank, a new water treatment plant, and additions <br />to distribution lines; and <br />
The URL can be used to link to this page
Your browser does not support the video tag.