Laserfiche WebLink
engineering firm the utilities department has used for many years. The letter, <br /> written by Mr. Jim Ulmer discussed the analysis of bids received for the utilities <br /> next large project of replacing approximately a mile of water lines to 18" lines on <br /> White Drive. Mr. Johnson explained that when Olsson reviewed the Statement of <br /> Qualifications required to be submitted with the bids, it appeared that the low <br /> bidder, Cornerstone Construction of Russellville, Inc. of$1,299,082.58 may have <br /> limited experience regarding construction of projects of the size and complexity <br /> of the project being bid. Having reviewed all of the bids and qualifications, <br /> Olsson was recommending to reject the low bid and go with the second lowest <br /> bid from Boyles Construction Company, Inc. in the amount of$1,526,669.00. Mr. <br /> Johnson said it is crucial that the work performed on the job be done with <br /> expertise because it ultimately provides water to the hospital and several <br /> industries. Councilmember Shetron cautioned the council to be prepared for <br /> possible litigation from the low bidder. Councilmember Matthews moved to take <br /> the advice of the engineers and accept the bid from Boyles Construction <br /> Company, Inc. for$1,526,669.00. Councilmember Bryant seconded and all <br /> voted for. <br /> C) CONSIDER A RESOLUTION ENDORSING INTIMIDATOR, INC. TO <br /> PARTICIPATE IN THE TAX BACK PROGRAM <br /> Councilmember Bryant introduced a resolution to endorse Intimidator, Inc. to <br /> participate in the Tax Back Program authorized by the State of Arkansas. Mr. <br /> Robert Foster was present to answer any questions from the council. Mr. Foster <br /> said the addition to Intimidator would be in 3 phases and include a 206 thousand <br />