Laserfiche WebLink
Clean Water and Energy from Wastewater <br /> DATE: September 8, 2017 <br /> TO: Eugene Townsley,City of Batesville <br /> FROM: Kyle Booth, World Water Works, Inc. (WWW) <br /> CC: Christine Woltman,Jason Choate, WWW <br /> RE: DAF Walkways <br /> ..................................................■.............................■■ <br /> Dear Eugene, <br /> Please see the following quote for the additional walkways on the WWW DAF units. The walkways will <br /> mate up to the existing installed walkways and run down the outside of each of the DAF units. The <br /> Additional part will attached between walkway and the existing structure. <br /> Scope of Work: <br /> World Water Works will supply the walkways with handrails on both sides, small step from existing <br /> platforms to the new one. WWW will supply the necessary brackets and hardware to mount the <br /> walkway to the existing DAF units. New supports will be included to weld on to the DAF. The welding of <br /> the supports on site and assembly of the walkway is estimated for(3) WWW personnel, a total of(3) <br /> days' onsite. Two additional days are required for travel to and from the jobsite. We have not included <br /> the rental of any equipment to lift and place the walkways. If rental is needed, it will be billed <br /> separately. Man hours are assumed as weekday hours. <br /> Pricing: <br /> DESCRIPTION QTY EACH TOTAL <br /> Walkway on Piping Side of DAF <br /> 2 $10,769.23 $21,538 <br /> unit <br /> Additional Walkway to Existing <br /> 1 $11,500.00 $11,500 <br /> Area <br /> Walkway Supports, PreFab 1 $4,923.08 $4,923 <br /> Superintendant (5) 8hr/days 40 $85.00 $3,400 <br /> Labor (5) 8hr/days X 2 80 $65.00 $5,200 <br /> Per Diem Person/DAY 15 $150.00 $2,250 <br /> Shipping to Site 1 7S0 750 <br /> Total <br /> $49,562 <br /> Estimate <br /> • <br /> • Page 1 <br />