M & A JONES CONSTRUCTION
<br /> P.O.Box 3944 1530 Batesville Blvd. Batesville,Arkansas 72503
<br /> Phone(870)251-1969 Fax(870)251-1187
<br /> October 10, 2022
<br /> Mr.Alan Cockrill
<br /> Batesville Police Department
<br /> Batesville, Arkansas
<br /> Re: Remodel NCO Building
<br /> -Furnish labor and materials to.refurbish the existing NCO building as per adjusted floor plan.
<br /> -Demolish and haul off concrete slab under drive thru
<br /> -Demolish and haul off existing drop ceilings,floor covering,walls and doors
<br /> -Pour concrete slab for evidence room
<br /> -Pour concrete for interior plumbing lines
<br /> -8" split face blocks at drive thru,filled with zonalite,4" split face blocks at two door openings on
<br /> sidewall
<br /> -Metal stud walls, blocking
<br /> -Cabinets in two breakrooms
<br /> -Sound insulation in new walls, 3"foam insulation on existing metal roof deck
<br /> -Hollow metal frames,solid core birch wood doors,commercial hardware
<br /> -Move one set of double glass entrance doors,add one new single aluminum entrance door
<br /> -Hang and finish 5/8"fire-rated gypsum board
<br /> -Paint hollow metal doors, hollow metal frames,stain wooden doors, paint blocks, paint gypsum board,
<br /> paint outside canopy
<br /> -2 x 2 metal ceiling grid system, 5/8" acoustical tiles
<br /> -Ceramic tile at entrance and front restroom,vinyl plank floor tile,vinyl base
<br /> -Toilet accessories,solid plastic toilet partitions,mirrors, door signs for restrooms,fire extinguishers
<br /> -Plumbing: Run new water and sanitary lines for two new restrooms. Refurbish two existing restrooms.
<br /> New faucets for breakroom sinks. Add gas piping for evidence heater.
<br /> -HVAC: New A.C. unit for evidence room, new mini split for server room, rework ducting as required,
<br /> checkout HVAC equipment for lower section, new ceiling diffusers, restroom exhaust fans.
<br /> -Electrical:New 2 x 2 LED lay in light fixtures, exit and emergency lights, 115V receptacles,data stub ups,
<br /> power for new A.C. units.
<br /> -Building permit, supervision, clean up
<br /> This is a budgetary price including labor, materials, taxes,freight and insurance.
<br /> The price is$492,470.00(Four Hundred Ninety Two Thousand, Four Hundred Seventy Dollars).
<br /> Items not included: outside signage, data wiring, refrigerator,stove, microwave, interior door signage
<br /> other thank restrooms, landscaping, architectural set of plans.
<br /> M &A Jones
<br /> Arch Jones
<br />
|