My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-12-12-AGENDA
CITY-OF-BATESVILLE
>
Web Folders
>
Agendas
>
City Council Agendas
>
2023
>
2023-12-12-AGENDA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 8:17:46 AM
Creation date
12/12/2023 8:17:25 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 16. Private Fire Connections <br />Private fire connections for private premises shall pay the following fire service charges per year. <br />16.1 Automatic sprinkler system connections shall be charged as follows: <br />16.1.1 1,000 heads or less <br />16.1.2 For systems containing more than <br />1,000 heads, for each head <br />16.2 Private fire hydrants; standard <br />Two (2) 2.5-inch standard hose connections <br />One (1) 4.5-inch pumper knozzle <br />16.3 Standard hydrant with one 2.5 inch <br />Hose connection <br />$612.00 annually <br />$612.00 annually <br />plus $0.68 per head (each) <br />$612.00 annually <br />per hydrant <br />$442.00 annually <br />per hydrant <br />16.4 The service charge for fire hose standpipes shall be: <br />16.4.1 1.25" diameter openings, or smaller <br />16.4.2 1.5" diameter openings <br />16.4.3 2.0" diameter openings <br />16.4.4 2.5" diameter openings <br />Section 17. Sewer Tap Fees <br />$41.00 annually (each) <br />$68.00 annually (each) <br />$153.00 annually (each) <br />$305.00 annually (each) <br />After the customer has excavated in accordance with all safety standards, Batesville <br />Water Utilities shall, on existing main line and manholes, make the tap at a charge of $500.00 per <br />tap up to 6" (inches). In a development of another developer who installed approved stub -outs, a <br />builder shall be charged a $150.00 fee by Batesville Water Utilities for access to the sanitary <br />sewer. Sewer connections for a developer building its own development where it has connected <br />approved sewer lines and manholes with approved stub -outs shall be assessed an access fee. Use <br />by a customer of an existing pre -used sewer connection shall not be assessed an access fee, all <br />taps, connections, stub -outs, and sewer lines attaching to the Batesville Water Utilities sewer <br />collection system shall be inspected and approved by a representative of Batesville Water <br />Utilities before access will be granted to the system. Batesville Water Utilities shall be contacted <br />prior to construction to allow time to schedule a representative to inspect during construction. <br />
The URL can be used to link to this page
Your browser does not support the video tag.