.2 organizing and participating in selection interviews with prospective contractors; <br /> .3 preparing responses to questions from prospective contractors and providing clarifications and <br /> interpretations of the Proposal Documents to the prospective contractors in the form of addenda;and, <br /> .4 participating in negotiations with prospective contractors,and subsequently preparing a summary <br /> report of the negotiation results,as directed by the Owner. <br /> §3.5.3.3 If the Proposal Documents permit substitutions,upon the Owner's written authorization,the Architect shall, <br /> as an Additional Service,consider requests for substitutions and prepare and distribute addenda identifying approved <br /> substitutions to all prospective contractors. <br /> §3.6 Construction Phase Services <br /> §3.6.1 General <br /> §3.6.1.1 The Architect shall provide administration of the Contract between the Owner and the Contractor as set <br /> forth below and in AIA Document A201 Tx-2017,General Conditions of the Contract for Construction.If the Owner <br /> and Contractor modify,AIA Document A201-2017,those modifications shall not affect the Architect's services <br /> under this Agreement unless the Owner and the Architect amend this Agreement. <br /> §3.6.1.2 The Architect shall advise and consult with the Owner during the Construction Phase Services.The <br /> Architect shall have authority to act on behalf of the Owner only to the extent provided in this Agreement.The <br /> Architect shall not have control over,charge of,or responsibility for the construction means,methods,techniques, <br /> sequences or procedures,or for safety precautions and programs in connection with the Work,nor shall the <br /> Architect be responsible for the Contractor's failure to perform the Work in accordance with the requirements of the <br /> Contract Documents.The Architect shall be responsible for the Architect's negligent acts or omissions,but shall not <br /> have control over or charge of,and shall not be responsible for,acts or omissions of the Contractor or of any other <br /> persons or entities performing portions of the Work. <br /> §3.6.1.3 Subject to Section 4.2 and except as provided in Section 3.6.6.5,the Architect's responsibility to provide <br /> Construction Phase Services commences with the award of the Contract for Construction and terminates on the date <br /> the Architect issues the final Certificate for Payment. <br /> §3.6.2 Evaluations of the Work <br /> §3.6.2.1 The-Architect shall visit the site at intervals appropriate to the stage of construction,or as otherwise <br /> required in Section 4.2.3,to become generally familiar with the progress and quality of the portion of the Work <br /> completed,and to determine,in.general,if the Work observed is being performed in a manner indicating that the <br /> Work,when fully completed,will be in accordance with the Contract Documents.However,the Architect shall not <br /> be required to.make exhaustive or continuous on-site inspections to check the quality or quantity of the Work.On <br /> the basis of the site visits,the Architect shall keep the Owner reasonably informed about the progress and quality of <br /> the portion of the Work completed,and promptly report to the Owner(1)known deviations from the Contract <br /> Documents,(2)known.deviations from the most recent construction schedule submitted by the Contractor,and(3) <br /> defects and deficiencies observed in the Work. <br /> §3.6.2.2 The Architect has the authority to reject Work that does not conform to the Contract Documents.Whenever <br /> the Architect considers it necessary or advisable,the Architect shall have the authority to require inspection or <br /> testing of the Work in accordance with the provisions of the Contract Documents,whether or not the Work is <br /> fabricated,installed or completed.However,neither this authority of the Architect nor a decision made in good faith <br /> either to exercise or not to exercise such authority shall give rise to a duty or responsibility of the Architect to the <br /> Contractor,Subcontractors,suppliers,their agents or employees,or other persons or entities performing portions of <br /> the Work. <br /> §3.6.2.3 The Architect shall interpret and decide matters concerning performance under,and requirements of,the <br /> Contract Documents on written request of either the Owner or Contractor.The Architect's response to such requests <br /> shall be made in writing within any time limits agreed upon or otherwise with reasonable promptness. <br /> §3.6.2.4 Interpretations and decisions of the Architect shall be consistent with the intent of,and reasonably inferable <br /> from,the Contract Documents and shall be in writing or in the form of drawings.When making such interpretations <br /> and decisions,the Architect shall endeavor to secure faithful performance by both Owner and Contractor,shall not <br /> show partiality to either,and shall not be liable for results of interpretations or decisions rendered in good faith.The <br /> Init. AIA Document B101—2017.Copyright @ 1974,1978,1987,1997,2007 and 2017.All rights reserved."The American Institute of Architects,""American Institute <br /> of Architects;"AIA,"the AIA Logo,and"AIA Contract Documents"are trademarks of The American Institute of Architects.This document was produced at 9 <br /> 17:10:13 ET on 11/30/2023 under Order No.4104245152 which expires on 09/10/2024,is not for resale,is licensed for one-time use only,and may only be used <br /> in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. <br /> User Notes: (369ADA26) <br />