.1 Two(2)maximum reviews of each Shop Drawing,Product Data item,sample and similar submittals
<br /> of the Contractor
<br /> .2 A Maximum of Two(2)OAC Meeting per month.
<br /> ". .3 A Maximum of Two(2)visit to the site monthly or as needed to review the Construction Process by
<br /> the Architect during construction
<br /> >A Two(2)inspections for any portion of the Work to determine whether such portion of the Work is
<br /> substantially complete in accordance with the requirements of the Contract Documents
<br /> " .5 Two(2)inspections for any portion of the Work to determine final completion.
<br /> §4.2.4 Except for services required under Section 3.6.6.5 and those services that do not exceed the limits set forth in
<br /> Section 4.2.3,,Construction Phase Services provided more than 60 days after(1)the date of Substantial Completion
<br /> of the Work or:(2)the initial date of Substantial Completion identified in the agreement between the Owner and
<br /> Contractor,whichever is earlier,shall be compensated as Additional Services to the extent the Architect incurs
<br /> additional cast in providing those Construction Phase Services.
<br /> §4.2"5 If the services covered by this Agreement have not been completed within Thirty-Six(36)months of the
<br /> date of this Agreement,through no fault of the Architect,extension of the Architect's services beyond that time shall
<br /> be compensated as Additional Services.
<br /> ARTICLE 5 OWNER'S RESPONSIBILITIES .
<br /> §5.1 Unless otherwise provided for under this Agreement,the Owner shall provide information in a timely manner
<br /> regarding requirements for and limitations on the Project,including a written program,which shall set forth the
<br /> Owner's objectives;schedule;constraints and criteria,including space requirements and relationships;flexibility;
<br /> expandability;special equipment;systems;and site requirements.
<br /> §5.2 The Owner shall establish the Owner's-budget for the Project,including(1)the budget for the Cost of the Work
<br /> as defined in Section 6.1;(2)the Owner's other costs;and,(3)reasonable contingencies related to all of these costs.
<br /> The Owner shall update the Owner's budget for the Project as necessary throughout the duration of the Project until
<br /> final completion,If the Owner significantly increases or decreases the Owner's budget for the Cost of the Work,the
<br /> Owner shall notify the Architect.The Owner and the Architect shall thereafter agree to a corresponding change in
<br /> the Project's,scope and quality.
<br /> §5.3 The Owner shall identify a representative authorized to act on the Owner's behalf with respect to the Project.
<br /> The Owner shall render decisions and approve the Architect's submittals in a timely manner in order to avoid
<br /> unreasonable delay in the orderly and sequential progress of the Architect's services.
<br /> §5A The Owner shall furnish surveys to describe physical characteristics,legal limitations and utility locations for
<br /> the site of the Project,and a written legal description of the site.The surveys and legal information shall include,as
<br /> applicable,grades and lines of streets,alleys,pavements and adjoining property and structures;designated wetlands;
<br /> adjacent drainage;rights-of-way,restrictions,easements,encroachments,zoning,deed restrictions,boundaries and
<br /> contours of the site;locations,dimensions,and other necessary data with respect to existing buildings,other
<br /> improvements and trees;and information concerning available utility services and lines,both public and private,
<br /> above and below grade,including inverts and depths.All the information on the survey shall be referenced to a
<br /> Project benchmark.
<br /> §5.5 The Owner shall furnish services of geotechnical engineers,which may include test borings,test pits,
<br /> determinations of soil bearing values,percolation tests,evaluations of hazardous materials,seismic evaluation,
<br /> ground corrosion tests and resistivity tests,including necessary operations for anticipating subsoil conditions,with
<br /> written reports and appropriate recommendations.
<br /> §5X The Owner shall provide the Supplemental,Services designated as the Owner's responsibility in Section 4.1.1.
<br /> §5.7 Tf the Owner identified a Sustainable Objective in Article 1,the Owner shall fulfill its responsibilities as
<br /> required in AIA Document E204T'&-2017,Sustainable Projects Exhibit,attached to this Agreement.
<br /> §5.8 The Owner shall coordinate the services of its own consultants with those services provided by the Architect.
<br /> Upon the Architect's request,the Owner shall furnish copies of the scope of services in the contracts between the
<br /> Init. AIA Document 13101—2017.Copyright©1974,1978,1987,1997,2007 and 2017.All rights reserved."The American Institute of Architects,""American Institute
<br /> of Architects,""AIA,"the AIA Logo,and"AIA Contract Documents"are trademarks of The American Institute of Architects.This document was produced at 14
<br /> 17:10:13 ET on 11/30/2023 under Order No.4104245152 which expires on 09/10/2024,is not for resale,is licensed for one-time use only,and may only be used
<br /> in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com.
<br /> User Notes: (3139ADA213)
<br />
|