My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-12-01-R
CITY-OF-BATESVILLE
>
City Clerk
>
Resolutions
>
2023
>
2023-12-01-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2024 4:56:13 PM
Creation date
12/13/2023 3:44:54 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
.3 Other <br /> (Describe the method of compensation) <br /> Not Applicable <br /> §11.2 For the Architect's Supplemental Services designated in Section 4.1.1 and for any Sustainability Services <br /> required pursuant to Section 4.1.3,the Owner shall compensate the Architect as follows: <br /> (Paragraph Deleted) <br /> §11.3 For Additional Services that may arise during the course of the Project,including those under Section 4.2,the <br /> Owner shall compensate the Architect as follows: <br /> (Insert amount of,or basis for, compensation) <br /> Refer to Paragraph 11.7 below. <br /> §11.4 Compensation for Supplemental and Additional Services of the Architect's consultants when not included in <br /> Section 11.2 or 11.3,shall be the amount invoiced to the Architect plus Ten percent(10%),or as follows: <br /> (Paragraph°Deleted) <br /> §11.5 When compensation for Basic Services is based on a stipulated sum or a percentage basis,the proportion of <br /> compensation for each phase of services shall be as follows: <br /> Schematic Design Phase Twenty percent ( 20 %) <br /> Design,Development Phase Twenty-Five percent ( 25 %) <br /> Construction Documents Thirty-Five percent ( 35 %) <br /> Phase <br /> Procurement Phase Five percent ( 5 %) <br /> Construction Phase Fifteen percent ( 15 %) <br /> Total Basic Compensation one hundred percent ( 100 %) <br /> §11,6 When compensation identified in Section 11.1 is on a percentage basis,progress payments for each phase of <br /> Basic Services'shall be calculated by multiplying the percentages identified in this Article by the Owner's most <br /> recent budget for the Cost of the Work.Compensation paid in previous progress payments shall not be adjusted <br /> based on subsequent updates to the Owner's budget for the Cost of the Work. <br /> §11.6.1 When compensation is on a percentage basis and any portions of the Project are deleted or otherwise not <br /> _constructed,compensation for those portions of the Project shall be payable to the extent services are performed on <br /> those portions.The Architect shall be entitled to compensation in accordance with this Agreement for all services <br /> performed whether or not the Construction Phase is commenced. <br /> §11.7 The hourly billing rates for services of the Architect and the Architect's consultants are set forth below.The <br /> rates shall be adjusted in accordance with the Architect's and Architect's consultants'normal review practices. <br /> (If applicable;attach an exhibit of hourly billing rates or insert them below.) <br /> 1. Taggart Architects Hourly Rates areas follows. EDG Hourly Rates areas per the attached Hourly Rate Chart. <br /> Init. AIA Document B101—2017.Copyright @ 1974,1978,1987,1997,2007 and 2017.All rights reserved."The American Institute of Architects;"American Institute <br /> of Architects,""AIA,"the AIA Logo,and"AIA Contract Documents"are trademarks of The American Institute of Architects.This document was produced at 21 <br /> 17:10:13 ET on 11/30/2023 under Order No.4104245152 which expires on 0 911 012 024,is not for resale,is licensed for one-time use only,and may only be used <br /> / in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. <br /> User Notes: (31EI9ADA213) <br />
The URL can be used to link to this page
Your browser does not support the video tag.