§3.1.5 The Architect shall contact governmental authorities required to approve the Construction Documents and
<br /> entities providing utility services to the Project.The Architect shall respond to applicable design requirements
<br /> imposed by those authorities and entities.
<br /> §3:1.6 The Architect shall assist the Owner in connection with the Owner's responsibility for filing documents
<br /> required for the approval of governmental authorities having jurisdiction over the Project.
<br /> §3.2 Schematic Design Phase Services
<br /> §3.2.1 The Architect shall review the program and other information furnished by the Owner,and shall review laws,
<br /> codes,and regulations applicable to the Architect's services.
<br /> §3.2.2 The Architect'shall prepare a preliminary evaluation of the Owner's program,schedule,budget for the Cost
<br /> of the Work,Project site;the proposed procurement and delivery method,and other Initial Information,each in
<br /> terms of the other,to ascertain the requirements of the Project.The Architect shall notify the Owner of(1)any
<br /> inconsistencies discovered in the information,and(2)other information or consulting services that may be
<br /> reasonably needed for the Project.
<br /> §3.2.3 The Architect shall present its preliminary evaluation to the Owner and shall discuss with the Owner
<br /> alternative approaches to design and construction of the Project.The Architect shall reach an understanding with the
<br /> Owner regarding the requirements of the Project.
<br /> §3.2.4-Based on the Project requirements agreed upon with the Owner,the Architect shall prepare and present,for
<br /> the Owner's approval,a preliminary design illustrating the scale and relationship of the Project components.
<br /> §3.2.5 Based on the Owner's approval of the preliminary design,the Architect shall prepare Schematic Design
<br /> Documents for the Owner's approval.The Schematic Design Documents shall consist of drawings and other
<br /> documents including a"site plan,if appropriate,and preliminary building plans,sections and elevations;and may
<br /> include some combination of study models,perspective sketches,or digital representations.Preliminary selections
<br /> of major building systems and construction materials shall be noted on the drawings or described in writing.
<br /> §3.2.5.1'The Architect shall consider sustainable design alternatives,such as material choices and building
<br /> orientation,together with other considerations based on program and aesthetics,in developing a design that is
<br /> consistent with the Owner's program,schedule and budget for the Cost of the Work.The Owner may obtain more
<br /> advanced sustainable design services as'a Supplemental Service under Section 4.1.1.
<br /> §3.2.5.2 The Architect shall consider the value of alternative materials,building systems and equipment,together
<br /> with other considerations based on program and aesthetics,in developing a design for the Project that is consistent
<br /> with the Owner's program,schedule,and budget for the Cost of the Work.
<br /> §3.2.6 The Architect shall submit to the Owner an estimate of the Cost of the Work prepared in accordance with
<br /> Section 6.3.
<br /> §3.2.7 The Architect shall submit the Schematic Design Documents to the Owner,and request the Owner's
<br /> approval.
<br /> §3.3 Design Development Phase Services
<br /> §3.3.1 Based on the Owner's approval of the Schematic Design Documents,and on the Owner's authorization of
<br /> any adjustments in the Project requirements and the budget for the Cost of the Work,the Architect shall prepare
<br /> Design Development Documents for the Owner's approval.The Design Development Documents shall illustrate and
<br /> describe the development of the approved Schematic Design Documents and shall consist of drawings and other
<br /> documents including plans,sections,elevations,typical construction details,and diagrammatic layouts of building
<br /> systems to fix and describe the size and character of the Project as to architectural,structural,mechanical and
<br /> electrical systems,and other appropriate elements.The Design Development Documents shall also include outline
<br /> specifications that identify major materials and systems and establish,in general,their quality levels.
<br /> §3.3.2 The Architect shall update the estimate of the Cost of the Work prepared in accordance with Section 6.3.
<br /> Init. AIA Document B101—2017.Copyright @ 1974,1978,1987,1997,2007 and 2017.All rights reserved."The American Institute of Architects,""American Institute
<br /> of Architects,""AIA,"the AIA Logo,and"AIA Contract Documents"are trademarks of The American Institute of Architects.This document was produced at 7
<br /> 17:10:13 ET on 11/30/2023 under Order No.4104245152 which expires on 09/10/2024,is not for resale,is licensed for one-time use only,and may only be used
<br /> in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com.
<br /> User Notes: (3B9ADA2B)
<br />
|