General Superintendent
<br /> Project Manager(s)
<br /> Project Administration Manager
<br /> Closeout 1 Sr.Project Administrator
<br /> Safety Director
<br /> Safety Clerical
<br /> Quality Control Managers
<br /> Project Scheduler
<br /> Job Accountant
<br /> § 7.2.3 Wages or salaries of the Contractor's supervisory or administrative personnel engaged at factories,workshops
<br /> or while traveling,in expediting the production or transportation of materials or equipment required for the Work,but
<br /> only for that portion of their time required for the Work.
<br /> § 7.2.4 Costs paid or incurred by the Contractor,as required by taw or collective bargaining agreements,for taxes,
<br /> insurance,contributions,assessments,and benefits and,for personnel not covered by collective bargaining
<br /> agreements,customary benefits such as sick leave,medical and health benefits,holidays,vacations and pensions,
<br /> provided such cost are bases on wage and salaries included in the Cost of the Work under Sections 7.2.1 through 7.2.3,
<br /> § 7.2.5 If agreed rates for labor costs,in lieu of actual costs,are provided in this Agreement,the rates shall remain
<br /> unchanged throughout the duration of this Agreement,unless the parties execute a Modification.
<br /> § 7.3 Subcontract Costs
<br /> Payments made by the Contractor to Subcontractors in accordance with the requirements of the subcontracts and this
<br /> Agreement.
<br /> § 7A Costs of Materials and Equipment Incorporated in the Completed Construction
<br /> § 7A.1 Costs,including transportation and storage at the site,of materials and equipment incorporated,or to be
<br /> incorporated,in the completed construction.
<br /> § 7.4.2 Costs of materials described in the preceding Section 7.4.1 in excess of those actually installed to allow for
<br /> reasonable waste and spoilage.Unused excess materials,if any,shall become the Owner's property at the completion
<br /> of the Work or,at the Owner's option,shalt be sold by the Contractor.Any amounts realized from such sates shalt be
<br /> credited to the Owner as a deduction from the Cost of the Work.
<br /> § 7.5 Costs of Other Materials and Equipment,Temporary Facilides and Related Items
<br /> § 7.5.1 Costs of transportation,storage,installation,dismantling,maintenance,and removal of materials,supplies,
<br /> temporary facilities,machinery,equipment and hand tools not customarily owned by construction workers that are
<br /> provided by the Contractor at the site and fully consumed in the performance of the Work.Costs of materials,supplies,
<br /> temporary facilities,machinery,equipment,and tools,that are not fully consumed,shall be based on the cost or value
<br /> of the item at the time it is first used on the Project site.Costs for items not fully consumed by the Contractor shall
<br /> mean fair market value.
<br /> § 7.5.2 Rental charges for temporary facilities,machinery,equipment,and hand tools not customarily owned by
<br /> construction workers that are provided by the Contractor at the site,and the costs of transportation,installation,
<br /> dismantling,minor repairs,and removal ofsuch temporary facilities;machinery,equipment,and hand tools.The total
<br /> rental cost of any such equipment may not exceed the purchase price of any comparable item.
<br /> § 7 5 3 Costs of removal of debris Front the site of the Work and it_ c Ttn gd t djb�gal, _..
<br /> § 7.5A Costs of the Contractor's site office,including general office equipment and supplies,
<br /> § 7.5.5 Costs of materials and equipment suitably stored off the site at a mutually acceptable location,subject to the
<br /> Owner's prior approval.
<br /> Init. AtA Document A102--20 t 7.Copyright 0 1920,1926,1951,1958,1961,1963,t967.1974,1978,1987,1997.2007 and 2017.All rights reserved'The American
<br /> institute of Architects,"`American Institute of Architects,""AIA,"the AIA Logo,and"AIA Contract Documents'are trademarks of The American tnsthute of Architects. 6
<br /> This document was praduced at 15:07:01 CT on 121'212023 under Order No,4104240617 which expires on 03110f2024,is not for resale,is licensed for one-time
<br /> use only,and may only be used in accordance with the AIA Contract Documents"Terms of Service.To report copyright violations,e-mail
<br /> docinf4aiacontfacts.com.
<br /> User Notes: (1465209683)
<br />
|