My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-04-22-AGENDA PACKET
CITY-OF-BATESVILLE
>
Web Folders
>
Agendas
>
City Council Agendas
>
2025
>
2025-04-22-AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2025 3:54:03 PM
Creation date
4/18/2025 3:53:44 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16.1.2 For systems containing more than <br />1,000 heads, for each head <br />16.2 Private fire hydrants; standard <br />Two (2) 2.5-inch standard hose connections <br />16.3 Standard hydrant with one 2.5 inch <br />Hose connection <br />$612.00 annually <br />plus $0.68 per head (each) <br />$612.00 annually <br />per hydrant <br />$442.00 annually <br />per hydrant <br />16.4 The service charge for fire hose standpipes shall be: <br />16.4.1 1.25" diameter openings, or smaller <br />16.4.2 1.5" diameter openings <br />16.4.3 2.0" diameter openings <br />16.4.4 2.5" diameter openings <br />Section 17. Sewer Tap Fees <br />$41.00 annually (each) <br />$68.00 annually (each) <br />$153.00 annually (each) <br />$305.00 annually (each) <br />After the customer has excavated in accordance with all safety standards, Batesville Water <br />Utilities shall, on existing main line and manholes, make the tap at a charge of $300.00 per tap. In a <br />development of another developer who installed approved stub -outs, a builder shall be charged a <br />$75.00 fee by Batesville Water Utilities for access to the sanitary sewer. Sewer connections for a <br />developer building its own development where it has connected approved sewer lines and manholes <br />with approved stub -outs shall be assessed an access fee. Use by a customer of an existing pre -used <br />sewer connection shall not be assessed an access fee, all taps, connections, stub -outs, and sewer <br />lines attaching to the Batesville Water Utilities sewer collection system shall be inspected and <br />approved by a representative of Batesville Water Utilities before access will be granted to the <br />system. Batesville Water Utilities shall be contacted prior to construction to allow time to schedule <br />a representative to inspect during construction. <br />Section 18. Sewer Billing Procedure <br />Bills for sewer shall be rendered monthly. If a bill is not paid on or before the twentieth <br />(20'') day following the original date of billing, a ten (10) percent penalty shall be added to the bill. <br />
The URL can be used to link to this page
Your browser does not support the video tag.