My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-04-02
CITY-OF-BATESVILLE
>
City Clerk
>
Ordinances
>
2025
>
2025-04-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2025 11:18:34 AM
Creation date
4/28/2025 11:18:31 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
16.1.2 For systems containing more than $612.00 annually <br /> 1,000 heads, for each head plus $0.68 per head(each) <br /> 16.2 Private fire hydrants; standard $612.00 annually <br /> Two (2)2.5-inch standard hose connections per hydrant <br /> 16.3 Standard hydrant with one 2.5 inch $442.00 annually <br /> Hose connection per hydrant <br /> 16.4 The service charge for fire hose standpipes shall be: <br /> 16.4.1 1.25"diameter openings, or smaller $41.00 annually (each) <br /> 16.4.2 1.5"diameter openings $68.00 annually (each) <br /> 16.4.3 2.0"diameter openings $153.00 annually (each) <br /> 16.4.4 2.5"diameter openings $305.00 annually (each) <br /> Section 17. Sewer Tap Fees <br /> After the customer has excavated in accordance with all safety standards, Batesville Water <br /> Utilities shall, on existing main line and manholes, make the tap at a charge of$300.00 per tap. In a <br /> development of another developer who installed approved stub-outs, a builder shall be charged a <br /> $75.00 fee by Batesville Water Utilities for access to the sanitary sewer. Sewer connections for a <br /> developer building its own development where it has connected approved sewer lines and manholes <br /> with approved stub-outs shall be assessed an access fee. Use by a customer of an existing pre-used <br /> sewer connection shall not be assessed an access fee, all taps, connections, stub-outs, and sewer <br /> lines attaching to the Batesville Water Utilities sewer collection system shall be inspected and <br /> approved by a representative of Batesville Water Utilities before access will be granted to the <br /> system. Batesville Water Utilities shall be contacted prior to construction to allow time to schedule <br /> a representative to inspect during construction. <br /> Section 18. Sewer Billing Procedure <br /> Bills for sewer shall be rendered monthly. If a bill is not paid on or before the twentieth <br /> (201h) day following the original date of billing, a ten(10)percent penalty shall be added to the bill. <br />
The URL can be used to link to this page
Your browser does not support the video tag.