My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-07-02-R
CITY-OF-BATESVILLE
>
City Clerk
>
Resolutions
>
2025
>
2025-07-02-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2025 2:22:18 PM
Creation date
8/12/2025 2:22:13 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTION I'. DESIGN STANDARDS# <br /> 3. Side Path along West side of St. Louis: Construct a 10' multi-use side path along the west side of St. <br /> Louis, which is designed to accommodate bicycle and pedestrian traffic. With a 4-6' buffer between <br /> the street and the side path, many of the utility poles along the west side of the street can be avoided <br /> and left in the newly created buffer. However, right of way will need to be acquired along the west <br /> side, and some sites may acquire retaining walls to reconcile the grade difference between the side <br /> path and existing parking lots and /or structures. <br />
The URL can be used to link to this page
Your browser does not support the video tag.