My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025-07-01
CITY-OF-BATESVILLE
>
City Clerk
>
Ordinances
>
2025
>
2025-07-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2025 2:38:04 PM
Creation date
8/12/2025 2:38:04 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(1) Building lines and setback lines shall be a minimum of 50 feet from all industrial street right- <br /> of-way lines and a minimum of 70 feet from all arterial street right-of-way lines.A minimum of <br /> 30 feet of setback shall be provided on all other property lines. <br /> (2) Half of any adjacent permanent open space or easement retained by the grantor for utility or <br /> other purposes or dedicated to the public shall be allowed as part of the required 30 feet of <br /> setback,except that in no case shall the total separation between buildings on adjacent tracts or <br /> lots be less than 60 feet." <br /> Section 10. The revisions to the Batesville Subdivision Regulations recommended by the Batesville Planning <br /> Commission are hereby adopted and Title 15 of the Batesville Municipal Code is thereby amended. <br /> IF ANY PORTION OR PORTIONS OF THIS ORDINANCE ARE DEEMED OR HELD TO BE <br /> INVALID,SUCH INVALIDITY SHALL NOT AFFECT THE REMAINING PORTION OR PORTIONS <br /> OF THIS ORDINANCE. <br /> IT IS SO ORDAINED. <br /> IN WITNESS WHEREOF,we have set our hands this 221 day of July,2025. <br /> APPROVED: <br /> RICK B , <br /> ATTEST: <br /> d Ito <br /> JESSICA DA S, LERK <br /> APPROVED AS TO LEGAL FORM: <br /> (7 MEITZEN, CITY ATTORNEY <br />
The URL can be used to link to this page
Your browser does not support the video tag.