My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-12-02
CITY-OF-BATESVILLE
>
City Clerk
>
Ordinances
>
2009
>
2009-12-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2016 2:49:12 PM
Creation date
6/1/2016 2:48:54 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• (3) The award official may add other iron, steel, and/or manufactured goods <br /> to the list in subparagraph (b)(2) of this paragraph 8 if the Federal <br /> government determines that— <br /> (i) The cost of the domestic iron, steel, and/or manufactured goods <br /> would be unreasonable. The cost of domestic iron, steel, or <br /> manufactured goods used in the Project is unreasonable when the <br /> cumulative cost of such material will increase the cost of the <br /> overall Project by more than 25 percent; <br /> (ii) The iron, steel, and/or manufactured good is not produced, or <br /> manufactured in the United States in sufficient and reasonably <br /> available quantities and of a satisfactory quality; or <br /> (iii) The application of the restriction of section 1605 of ARRA would <br /> be inconsistent with the public interest. <br /> (c) Request for determination of inapplicability of Section 1605 of ARRA. <br /> (1) Requests to use foreign iron, steel, or manufactured goods <br /> (i) Any request to use foreign iron, steel, and/or manufactured goods <br /> © in accordance with subparagraph (b)(3) of this paragraph 8 shall <br /> include adequate information for EPA evaluation of the request, <br /> including— <br /> (A) A description of the foreign and domestic iron, steel, and/or <br /> manufactured goods; <br /> (B) Unit of measure; <br /> (C) Quantity; <br /> (D) Cost; <br /> (E) Time of delivery or availability; <br /> (F) Location of the project; <br /> (G) Name and address of the proposed supplier; and <br /> (H) A detailed justification of the reason for use of foreign iron, <br /> steel, and/or manufactured goods cited in accordance with <br /> subparagraph (b)(3) of this paragraph 8. <br /> (ii) A request based on unreasonable cost shall include a reasonable <br /> survey of the market and a completed cost comparison table in the <br /> format in subparagraph(d) below. <br /> (iii) The cost of iron, steel, and/or manufactured goods material shall <br /> include all delivery costs to the construction site and any <br /> applicable duty. <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.