My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-09-01-R
CITY-OF-BATESVILLE
>
City Clerk
>
Resolutions
>
2002
>
2002-09-01-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2016 8:38:43 AM
Creation date
6/2/2016 8:38:39 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Miller-Newell Engineers,Inc. <br /> PROGRAM NARRATIVE <br /> BATESVILLE REGIONAL AIRPORT <br /> NEED <br /> The Batesville Regional Airport through its recent Master Plan Update has recognized the <br /> need for an instrument approach to their facility. The privately owned VOR has been <br /> decommissioned for several years. As a result, instrument capability has been minimized. This <br /> has affected the volume of traffic to a certain extent. There is a need to plan for an approach and <br /> an instrument approach will require the MALSR system. The property is required in fee simple <br /> for the light lane. In addition, the RPZ will be expanded to comply with AC5300-13 dimensional <br /> standards. In addition, the Airport Commission wishes to pursue a GPS approach. To do so, an <br /> obstruction chart must be generated for use in developing a procedure. The need exists to <br /> provide a survey for this purpose. <br /> OBJECTIVE <br /> The objective of this project is to improve safety for all weather users of the airport <br /> facility. By providing the property for the light lane,the airport will be in position to provide the <br /> land for the MALSR Light Lane as the instrument procedure is planned and eventually becomes <br /> a reality. An orderly preparation will insure a timely installation of the required facilities for the <br /> future Instrument Landing Procedure. The survey will provide the location and elevation of <br /> obstructions in the approach. The survey will allow the preparation of an approach procedure for <br /> PROGRAM NARRATIVE -I- <br />
The URL can be used to link to this page
Your browser does not support the video tag.