My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-09-01-R
CITY-OF-BATESVILLE
>
City Clerk
>
Resolutions
>
2002
>
2002-09-01-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2016 8:38:43 AM
Creation date
6/2/2016 8:38:39 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
'�. a. Withholding of payments to the contractor under the contract <br /> until the contractor complies, and/or <br /> b. Cancellation, termination, or suspension of the contract, in <br /> whole or in part. <br /> 6. Incorporation of Provisions. The contractor shall include the <br /> provisions of paragraphs 1 through 5 in every subcontract, including pro- <br /> curements of materials and leases of equipment, unless exempt by the <br /> Regulations or directives issued pursuant thereto. The contractor shall take <br /> such action with respect to any subcontract or procurement as the sponsor or <br /> the FAA may direct as a means of enforcing such provisions including sanctions <br /> for noncompliance. Provided, however, that in the event a contractor becomes <br /> involved in, or is threatened with, litigation with a subcontractor or supplier <br /> as a result of such direction, the contractor may request the Sponsor to enter <br /> into such litigation to protect the interests of the sponsor and, in addition, <br /> the contractor may request the United States to enter into such litigation to <br /> protect the interests of the United States. <br /> Attachment 1, Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.