My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-10-28
CITY-OF-BATESVILLE
>
City Clerk
>
Minutes
>
2014
>
2014-10-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2015 4:09:44 PM
Creation date
5/12/2015 4:09:42 PM
Metadata
Fields
Template:
City Clerk
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Engineer Damon Johnson said the Eagle Mountain Sub-Division was platted by <br /> an engineer and constructed to those specifications. Ms. Shirley Coe who is Ms. <br /> Simmons neighbor said she too has drainage issues and has spent thousands of <br /> dollars on her property to try and control the water runoff. Mr. Johnson said the <br /> City could put an asphalt brume at the opening of her driveway and widen the <br /> throat of the storm drain next to the driveway and possibly help the runoff. <br /> B) MR. BOB CARIUS WITH A BUDGET REQUEST FOR MAIN STREET <br /> BATESVILLE <br /> Mr. Bob Carius and Mr. Danny Dozier addressed the council regarding funding <br /> for Main Street Batesville. Mr. Carius asked that the City continue to support <br /> Main Street as in the past with the $10,000.00 contribution. Mr. Dozier asked the <br /> council to consider an additional $10,000.00 for specific projects. $5,000.00 to <br /> make improvements to the Pocket Park and $5,000.00 to add 6 or more lanterns <br /> and banners. The Mayor said the council will take their request under <br /> advisement. <br /> C) CONSIDER AN ORDINANCE TO WAIVE COMPETITIVE BIDDING AND <br /> AUTHORIZE BATESVILLE WATER UTILITY TO CONTRACT FOR THE <br /> TRANSITION TO THE RECENTLY CONSTRUCTED GRAVITY TUNNEL <br /> Councilmember Matthews introduced an ordinance to waive competitive bidding <br /> and authorize the Batesville Utility Department to contract for the transition of <br /> wastewater flow from the pump system to the recently constructed gravity tunnel. <br /> Councilmember Matthews moved to read the ordinance by title only. <br /> Councilmember Bryant seconded and the roll call count was 8 for and 0 against. <br />
The URL can be used to link to this page
Your browser does not support the video tag.