My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-02-03-R
CITY-OF-BATESVILLE
>
City Clerk
>
Resolutions
>
2009
>
2009-02-03-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2016 10:00:06 AM
Creation date
6/2/2016 10:00:04 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Trails Transportation <br /> The city will develop a comprehensive trail system that The proposed transportation system appears as part of <br /> includes sidewalks,bike trails, and bike lanes. They will the comprehensive plan map on the opposite side of this <br /> link schools,major attractions,and community facilities. brochure. It recognizes the potential for an eastern bypass <br /> Pedestrian access will help support the growth and as shown on the Arkansas Highway and Transportation <br /> redevelopment of other key elements of this plan, such Department's 2006 Capacity Needs Map. This bypass would <br /> as the downtown and the riverfront areas. The City will provide a beneficial impact on future industrial growth east <br /> target trails in areas recommended by the community and of the city. The transportation plan also recognizes the need <br /> city staff throughout the planning process and during its to improve street-connectivity within the city to allow better <br /> implementation. fire and police protection. <br /> The plan calls for additional streets serving the schools and <br /> the medical complex. One will connect the Eagle Mountain <br /> community with the school facilities on Pioneer Drive. <br /> This facility has been a part of the adopted master street <br /> plan for some time but has never been built.A second street <br /> improvement is the connection of the south end of Jennings <br /> Lane with the north end of Jennings Lane and continuing <br /> across Harrison Street/Highway 69 to connect with 30th <br /> Street and Neely Street. <br /> 1 - Another proposed street is a connection between Virginia <br /> Drive/Hospital Circle and 20th Street. This will provide <br /> better access to the medical center,a major asset of the <br /> Batesville area. <br /> Proposed trail along Pioneer Drive <br /> The plan proposes upgrading 20th Street from its intersectior <br /> Recreation with Pioneer Drive to Harrison Street/Highway 69 to a major <br /> The city will create a comprehensive parks system plan that arterial-level street. <br /> builds on existing assets in the community. The city's strategy <br /> will be to combine all sports facilities into a centralized The planning commission will also study the possibility of <br /> complex and disperse smaller parks,playgrounds, and an east-west connector between East Main Street/Highway <br /> greenspaces in neighborhoods around the city. 223 at the Miller Creek Road intersection and Highway 69 in <br /> the Sawmill Subdivision area. <br /> When developing future parks,the city will consider the <br /> recommendations expressed by the community during the The plan proposes a major traffic artery as part of the <br /> planning process, including the need for a park on the west redevelopment of the existing Batesville Country Club golf <br /> side of town,the creation of a community/recreation center, course property and would include upgrading Myers Avenue <br /> and other recommendations. from U.S. 167 to 20th Street. <br /> The city will also work to enhance the Poke Bayou and Beautification <br /> riverfront areas with parks,trails,boat rentals, entertainment <br /> venues,and other beneficial developments. Flood-prone The city will take a comprehensive approach to <br /> beautification <br /> areas will be recommended for lake impoundments. fication that considers signage, landscaping, <br /> preservation, and other elements by creating new regulations. <br /> One of the top needs identified by the public during the The city will combine stronger sign regulations with <br /> planning process was to consolidate youth sports activities in landscaping and welcoming signage to enhance corridors <br /> a unified location.This will remove the burden upon parents and gateways. Moreover, the city will develop landscaping <br /> who have children in different activities at the same time. and tree preservation guidelines for new developments. <br /> Planners identified three possible locations for a unified Community Facilities <br /> sports complex. One exists in the floodplain of the White Planned community facilities appear on the plan map.These <br /> River,another lies in the area along Miller Creek, and the include the new fire station and a long-range goal of a <br /> third would involve expansion of the present sports complex special-needs firefighting facility at the airport. <br /> in the north portion of the planning area.A fourth location <br /> was removed from consideration because its proposed Batesville enjoys the benefits of a superior school system <br /> location was in the floodway of the White River. that should be supported by the comprehensive plan. This <br /> means, among other things, improving the transportation <br /> The general locations of the proposed alternates are shown system to serve area schools. Such improvements will <br /> on the plan map on the opposite page. include the proposed street connections shown herein. <br />
The URL can be used to link to this page
Your browser does not support the video tag.