My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-07-01-R (2)
CITY-OF-BATESVILLE
>
City Clerk
>
Resolutions
>
2009
>
2009-07-01-R (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2016 10:24:40 AM
Creation date
6/2/2016 10:24:39 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
2. We hereby request that The Arkansas State Highway Commission make every <br /> effort to speed up the construction of four lanes plus from Batesville to Cave City and ultimately <br /> to Ash Flat to increase capacity, improve traffic operations and enhance safety on Highway 167. <br /> 3. We consider the Batesville Expressway (Bypass) essential to the economic <br /> development of our area and recognizing that extraneous funding from outside of normal funding <br /> options will be required we will continue to pursue special funding for the Batesville Expressway <br /> (Bypass) through our Congressional Delegation in Washington, D.C. and also request that <br /> Congress designate U.S. Highway 167 between Bald Knob and Ash Flat as a "High Priority <br /> Corridor". <br /> 4. We hereby request that The Arkansas State Highway Commission authorize the <br /> Director to proceed with environmental studies, surveys, design, right-of-way acquisition, and <br /> construction as funds become available for the Batesville Expressway (Bypass). <br /> This RESOLUTION adopted this 2 1 day of , 2009. <br /> Mayor augh <br /> Attest: <br /> Denise Johnston, City Clerk <br />
The URL can be used to link to this page
Your browser does not support the video tag.