Laserfiche WebLink
INSPECTION RATES <br /> PLUMBING <br /> Buildings on concrete slab <br /> Rough In before slab is poured : $ 25.00 <br /> Top Out before being covered up : $ 25.00 <br /> Final $ 25.00 <br /> Buildings on wood floor <br /> Rough In and Top Out $ 50.00 <br /> Final : $ 25.00 <br /> Natural Gas : <br /> Pressure Tests : $ 25.00 <br /> A plumbing permit will be required for <br /> 1. New construction. <br /> 2. Remodeling. <br /> (W 3. Demolition. <br /> The permit fee is $ 10.00 up to $ 10,000.00. Then $ 1.00 per$ 1,000.00 over$ <br /> 10,000.00 will be added to the initial $ 10.00 permit fee.Permits may be applied for at the <br /> Municipal Building at 500 East Main Street (870)-698-2400. <br /> Notice : <br /> A Surety Bond in the amount of$ 1,000.00 made to the City of Batesville will be on file <br /> `with the Code Enforeement Department before any company or plumber perforins <br /> construction, repairs or service work in the City of Batesville. <br />