My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-08-13
CITY-OF-BATESVILLE
>
City Clerk
>
Minutes
>
2013
>
2013-08-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2016 3:01:10 PM
Creation date
6/2/2016 3:01:07 PM
Metadata
Fields
Template:
City Clerk
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Councilmember Matthews moved to further suspend the rules and waive the <br /> second and third readings. Councilmember Bryant seconded and the roll call <br /> count was 8 for and 0 against. Councilmember Matthews moved to adopt the <br /> ordinance and Councilmember Bryant seconded. The roll call count was 8 for <br /> and 0 against. The ordinance was given #2013-8-2. <br /> H) CONSIDER A RESOLUTION TO ACCEPT BIDS ON LIGHTING FOR SOCCER <br /> AND YOUTH BASEBALL COMPLEX <br /> Councilmember Bryant introduced a resolution to accept the low bid by Wades <br /> Heating, AC and Electric of$724,300.00 for field area lighting at the North <br /> Complex and the East Main Soccer Complex. The City Clerk read the resolution <br /> in full. Councilmember Bryant moved to adopt the resolution and <br /> Councilmember Shetron seconded. The roll call count was 8 for and 0 against. <br /> The resolution was given #2013-8-2-R. <br /> 1) ENGINEER'S REPORT <br /> City Engineer Damon Johnson addressed the council with his Engineer's Report. <br /> Mr. Johnson gave an update on the Wastewater Treatment Plant expansion, the <br /> Water Treatment upgrades and several water and sewer construction jobs <br /> throughout the City. He also said that during a recent bridge inspection of the <br /> Golden Overpass, it has been recommended that several repairs be made. He <br /> said primarily, the expansion joints need to be replaced. He said he got a quote <br /> from Beverly's Construction, the company who constructed the bridge in 1972, of <br /> $15,720.00. Mr. Johnson said it is not something that has to be done right now <br /> but the longer it is put off the more repairs will have to be made. The Mayor said <br />
The URL can be used to link to this page
Your browser does not support the video tag.