My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-07-10
CITY-OF-BATESVILLE
>
City Clerk
>
Minutes
>
2012
>
2012-07-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2016 3:03:15 PM
Creation date
6/2/2016 3:03:13 PM
Metadata
Fields
Template:
City Clerk
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
resolution in full. Councilmember Matthews moved to adopt the resolution and <br /> Councilmember Bryant seconded. The roll call count was 8 for and 0 against. <br /> The resolution was given #2012-7-2-R. <br /> E) CONSIDER AN ORDINANCE ACCEPTING CERTAIN TERRITORY TO BE <br /> ANNEXED INTO THE CITY LIMITS OF BATESVILLE <br /> Councilmember Bryant introduced an ordinance accepting certain territory to be <br /> annexed into the City limits of Batesville. The property is located south of the <br /> White River Bridge and West of Highway 167 and includes T-Mart#12 located at <br /> 50 Batesville Blvd., US Pizza at 60 Batesville Blvd and Wholesale Tire at 66 <br /> Batesville Blvd. Mr. Castleberry read the ordinance in full. Councilmember <br /> Matthews moved to suspend the rules and waive the second and third readings. <br /> Councilmember Bryant seconded and the roll call count is 8 for and 0 against. <br /> Councilmember Bryant moved to adopt the ordinance and Councilmember <br /> Shetron seconded. The roll call count was 8 for and 0 against. The ordinance <br /> was given #2012-7-2. <br /> F) ENGINEER'S REPORT <br /> Mr. Damon Johnson, City Engineer, addressed the council with his engineer's <br /> report. He said because of the extreme drought, the water plant is producing 7.3 <br /> million gallons of water per day but is able to keep up with the demand. On the <br /> other end of the spectrum, to hot dry weather is good for the wastewater plant. <br /> The City and Utility crews are continuing their work on Myers Street at Row Lake <br /> and progress is steady. The Corp of Engineers and Utility crews are working to <br /> clean out the pond which had more debris than anticipated. <br />
The URL can be used to link to this page
Your browser does not support the video tag.