Laserfiche WebLink
approved stub-outs shall not be assessed an access fee. Use by a customer of an <br /> existing pre-used sewer connection shall not be assessed and access fee, all taps, <br /> connections, stub-outs, and sewer lines attaching to the Batesville Water Utilities <br /> sewer collection system shall be inspected and approved by a representative of <br /> Batesville Water Utilities before access will be granted to the system. Batesville <br /> Water Utilities shall be contacted prior to construction to allow time to schedule a <br /> representative to inspect during construction. <br /> Section 18. Sewer Billing Procedure <br /> Bills for sewer shall be rendered monthly. If a bill is not paid on or before the <br /> twentieth (200') day following the original date of billing, a ten (10) percent penalty <br /> shall be added to the bill. If a bill is not paid on or before the thirtieth(30th) day <br /> following the original date of billing, the City shall disconnect the water services to <br /> the premises. <br /> Section 19. Sewer Rates <br /> 19.1 Monthly Sewer Charges. Monthly sewer rates shall be based upon <br /> water consumption. <br /> 19.2 User Classification: The City shall classify all users of the sanitary <br /> sewer system as either domestic or commercial, on the basis of whether the water <br /> consumption for the individual user is for domestic or commercial purposes. <br /> 19.3 Definition of User: The term "user" is hereby defined as any person or <br /> entity whose buildings or premises are connected with and use the sanitary sewer <br />