My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-07-01
CITY-OF-BATESVILLE
>
City Clerk
>
Ordinances
>
2014
>
2014-07-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2015 4:31:53 PM
Creation date
5/12/2015 4:31:45 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Road bores for meters over I" shall be charged at cost of materials, parts, labor, and <br /> equipment usage. <br /> Section 6. Road Crossing or Boring Fee - Sewer <br /> Road bores for sewer connections shall be the responsibility of the customer or <br /> contractor. Batesville Water Utilities shall be contacted prior to construction to allow time to <br /> schedule a representative to inspect the road bore. <br /> Section 7. Inspection Fees <br /> The fee for inspections, both water and sewer, conducted inside the Batesville City <br /> limits shall be $35.00 per trip. If an inspection is required after normal work hours, the <br /> charge shall be $70.00. For each hour in excess of two (2) hours, the charge shall be $35.00 <br /> per hour. <br /> The fee for inspections, both water and sewer, conducted outside the Batesville City <br /> limits shall be $45.00 per trip. If an inspection is required after normal work hours, the <br /> charge shall be $90.00. For each hour in excess of two (2) hours, the charge shall be $45.00 <br /> per hour. <br /> If more than one inspection is performed on the same property for the same customer <br /> during the same trip in the normal allotted time, the charge shall be for one trip. Inspections <br /> may include the water service line, the sewer service line (sanitary sewer) and new <br /> construction rough-in, top-out and final inspection. <br /> Section 8. Water Billing, Non-Payment Fees, Disconnect Fees, and Reconnect <br /> Penalty Fees <br /> Water bills will be sent out on the last working day of each month and shall payable <br /> on or before the 20' day of the following month. Non-payment, disconnect and reconnect <br /> penalties and charges shall be on a per trip or per request basis as follows: <br />
The URL can be used to link to this page
Your browser does not support the video tag.