My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-05-24
CITY-OF-BATESVILLE
>
City Clerk
>
Minutes
>
2011
>
2011-05-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2016 3:06:22 PM
Creation date
6/2/2016 3:06:19 PM
Metadata
Fields
Template:
City Clerk
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
cousins. After a discussion, the council asked Mr. Castleberry to see if the City <br /> could put a $20,000 limit per occurrence for items that are not advertised for bids <br /> and no limit on purchases that are advertised for competitive bidding. Mr. <br /> Castleberry said he would check for the council and report back at the next <br /> meeting. <br /> D) DISCUSS THE REPLACEMENT OF THE RESTROOM AND CONCESSION <br /> STAND AT THE NORTH COMPLEX DUE TO FIRE DAMAGE <br /> Mayor Elumbaugh told the council he has been diligently working on the situation <br /> at the North Complex regarding the fire damaged restrooms and concession <br /> stand. He told the council the City received $62,000.00 in insurance monies and <br /> to date has spent approximately $28,700.00 which includes all new electrical <br /> wiring and a block building to house the wiring and a portable concession stand. <br /> Because of the size of the project, the City had to obtain an engineering firm and <br /> had hired ETC Engineering for the job. The Mayor said at first the engineers <br /> thought we could gut the current structure and remodel and add a couple of <br /> restroom stalls and a patio area but after further inspection, the 30 year old <br /> structure is not stable and will need to be torn down completely. The estimate for <br /> the remodel was between $118,000.00 and $136,000.00. The Mayor said he is <br /> waiting on a new estimate for constructing a new facility but has been told it <br /> should not be much more than the remodel estimate. He said that obviously, <br /> there was not enough money left from the insurance. He said he planned to ask <br /> the Quorum Court to redistribute $40,000 of the Count Grant for the City to help <br /> with the construction and was looking at fund raising ideas as well as local <br />
The URL can be used to link to this page
Your browser does not support the video tag.