ORDINANCE NO. / ) Lr - 3
AN ORDINANCE PROVIDING FOR THE CONSTRUCTION OF A
SANITARY SEWER, BIG PINE ADDITION, PHASE II , PROVIDING
FOR PAYMENT OF CONSTRUCTION COSTS FROM CONNECTION FEES
AGAINST THE USERS THEREOF, PROVIDING FOR THE FIXING AND
COLLECTING OF CONNECTION AND OTHER FEES, PROVIDING FOR
THE OPERATION AND MAINTENANCE BY THE CITY OF
BATESVILLE, ARKANSAS OF SUCH SEWER LINES TOGETHER WITH
ANY AND ALL SANITARY SEWER CONNECTION LINES THAT WILL
EMPTY INTO SAID TRUNK LINE SEWER EITHER DIRECTLY OR
INDIRECTLY", AND FOR OTHER PURPOSES.
WHEREAS, the City of Batesville, desires and needs the "Big
Pine Addition, Phase II Sewer Line" referred to hereafter; and
WHEREAS, interested property owners have offered to pay and
advance funds sufficient to make the construction of such sewer
line possible upon the condition that any additional sewer
• connection which results in sewage passing through any part of
said Big Pine Addition, Phase II , Sanitary Sewer Line until the
full amount of construction costs of such Big Pine Addition,
Phase II Sanitary Sewer Line have been fully paid, and
thereafter, fees for connection, shall belong to the Batesville
Utilities Commission; and
WHEREAS, the Batesville Utilities Commission will operate
and maintain such Big Pine Addition, Phase II Sanitary Sewer
together with any and all sanitary sewer main lines that will
empty into said Big Pine Addition, Phase II Sewer either
directly or indirectly continuously from and after the time of
completion of each of such lines;
NOW THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE
CITY OF BATESVILLE, ARKANSAS:
� 4
•
SECTION 1 : Property owners desiring or directed to make a
connection with the sanitary sewer line which the City of
Batesville proposes to construct in the Big Pine Addition in
East Batesville, Arkansas on the lands described as:
A tract of land being a part of the North Half of
Section 13 and a part of the North Half of Section 14
of T 13 N, R 6 W in the City of Batesville ,
Independence County, Arkansas, more particularly
described as follows : commencing at the West quarter
corner of said Section 13 ; thence North along the West
line of said Section 13 a distance of 447 . 90 feet to
the Southeast corner of Lot 12 of the Big Pine Addition
to said City of Batesville and the point of beginning;
thence continue North along said West line a distance
of 27 . 1 feet to the Northwest corner of Lot 7 of Block
2 of the Balch Addition to said City of Batesville;
thence East along the North line of said Lot 7 to the
Northeast corner of said Lot 7; thence Southeasterly to
• the Northwest corner of Lot 5 of Block 3 of said Balch
Addition; thence along the West and South line of said
Lot 5 to the Southwest corner of Lot 4 of said Block 3 ;
thence along the South line of Lots 4 , 3 and 2 of said
Block 3 to the Southwest corner of Lot One of said
Block 3 ; thence along the South and East line of said
Lot One to the Northeast corner of said Lot One; thence
East a distance of 50.0 feet more or less to a point on
the West line of Lot 4 of Block 5 of said Balch
Addition; thence South along the West line of said Lot
4 , Lot 3 and Lot 2 of said Block 5 to the Southwest
corner of said Lot 2 ; thence Southeasterly along the
South line of said Lot 2 to the Southeast corner of
said Lot 2 ; thence East a distance of 250 .0 feet;
thence North to the South right of way line of the
Union Pacific Railroad; thence Northwesterly along said
South right of way line to a point North of a Sanitary
Sewer Pump Station on a tract of land owned by Mobley
Lumber Company; thence South to said Sanitary Sewer
Pump Station; thence Southeasterly in a straight line
to the Southwest corner of Lot 28 of said Big Pine
Addition; thence Southeasterly along the South line of
Lots 28 , 27 , 26 , 25, 24 , 23 , 22 , 21 , 20 , 19 , 18 , 17 and
16 to the Southwest corner of said Lot 16 of said Big
Pine Addition; thence Northeasterly to the Northwest
corner of Lot 13 of said Big Pine Addition; thence
South along the West line of said Lot 13 and the West
line of said Lot 12 to the Southwest corner of said Lot
12 ; thence East along the South line of said Lot 12 to
the Southeast corner of said Lot 12 and the point of
beginning.
and property owners desiring or directed to make a connection
with any sewer system resulting in sewage passing through any
part of said sanitary sewer system proposed to be constructed
by the City of Batesville may make such connections upon the
payment of a connection fee to the Batesville Utilities
Commission.
SECTION 2 . A portion of said sanitary sewer system that
Batesville Utilities Commission is planning to install
beginning on about June 15 , 1990 shall be hereafter known as
® the Big Pine Addition, Phase II Sewer Line and the remainder of
such sanitary sewer system including any and all sanitary sewer
collection lines will empty into said Big Pine Addition, Phase
II Sewer Line either directly or indirectly shall be known
hereafter as Big Pine Addition, Phase II Sanitary Sewer
Collection Lines. The plans and specifications for each and
all of such lines shall be submitted to the Utilities
Commission of the City of Batesville, Arkansas for approval and
each and all of such sanitary sewer collection lines shall be
constructed according to such plans and specifications under
the supervision of the Batesville Utilities Commission and the
Engineers for the Batesville Utilities Commission. Fees
3
collected for sewer connection of said trunk line and for
connections resulting from sewage passing through any part of
said trunk line shall be paid to the Batesville Utilities
Commission, until the full amount of construction costs of Big
Pine Addition, Phase II Line have been fully paid; and all fees
collected after that time shall be regulated by and shall
belong to the Batesville Utilities Commission provided,
however, no further connection fees shall ever be assessed
against any single family residence for which fees for sewer
connection as provided 'herein have been paid.
SECTION 3 . Upon approval of the plans and specifications
and construction of the Big Pine Addition, Phase II sewer
system, including the Big Pine Addition, Phase II Sewer Line
and Sanitary Sewer Collection Lines including each and every
sanitary sewer line hereafter connected with this system or
connected so as to cause sewage to pass through any part of the
system, the Batesville Utilities Commission shall accept the
Y � p
same for operation and maintenance and assume responsibility
for and shall bear the costs and expense of operating and
maintaining said Big Pine Addition, Phase II Sewer Line and
each and all of the sanitary sewer collection lines in a proper
and efficient manner.
SECTION 4 : The connection fee authorized in Section 1 of
this ordinance to be paid to the Batesville Utilities
Commission is hereby fixed at $3 , 000 .00 for each single family
4
•
residence connected with or served by such sanitary sewer
system, for such connections as are made on or before the
completion of construction, which is to be paid at or before
the time the connection is made and no further fee is to be
charged for use of said line or shall ever be assessed against
said single family residence except for the normal sewer bill
which is based on water usage and inspection fee as provided in
Section 8 hereinafter. Connections made within a one year
period after completion shall be $3 , 500. 00 for each single
family residence. Connections made after the expiration of
this one year period shall be upon the basis of fees to be
determined by the Batesville Utilities Commission under the
• conditions then prevailing, taking into consideration the pro
rata costs of construction, maintenance, and operation, but in
no event shall be less than $3 ,500 . 00 unless modified by
ordinance of the City of Batesville.
SECTION 5 : In the event any business , industry or other
user desiring or directed to make a connection will cause more
water and sewage to flow into such system than flows from such
average single family residence, then the connection fee shall
be a sum based on the estimated water and sewage that will flow
into such sewer system from such user as compared with the
sewage from the average single family residence connected
therewith as determined and fixed by the Utilities Commission
of the City of Batesville, Arkansas.
SECTION 6 : In the event of the remodeling or enlarging of
any business , industry, or other user already connected with
such sanitary sewer system, or change of condition resulting in
more water and sewage flowing into said sewer systems from such
business, industry, or other user already connected, additional
connection fees may be charged and collected in an amount
thereof to be fixed and determined in the same manner.
SECTION 7 : Connection fees provided herein shall apply to
and be collected from all residences, businesses, industries,
and other users which connect to any sewer or sewer system
resulting in sewage passing through any part of said Big Pine
Addition, Phase II Sewer Line provided for in this ordinance.
SECTION 8 : No sewer connection shall be made without the
consent of the City of Batesville nor shall such connection be
made except upon inspection and approval by the City of
Batesville, Arkansas.
SECTION 9 : In the event any sewer connection is made
resulting in sewage flowing through any part of said Big Pine
Addition, Phase II Line without first obtaining permission to
make such connection, the owner of the property served by such
unauthorized connection of said sewer system shall pay a
penalty of $25 .00 per day for each day of such occurrence in
i
addition to any fees imposed by any other ordinance of the City
of Batesville.
SECTION 10 : If any part of this ordinance shall be held to
G6
i
be invalid, such invalidity shall not impair or effect the
remainder of the ordinance, but all parts and portions not held
to be invalid shall be and remain in full force and effect.
SECTION 11 : It is found and declared that there are
residences completed and occupied which will be connected to
and served by the sanitary sewer system proposed by this
ordinance and which will be without proper sewage disposal
pending the construction of the sanitary sewer system proposed
by this ordinance and that if the construction is commenced
without delay such proper means of sewage disposal will be made
available and that the prompt and efficient disposal of sewage
i
is necessary for the health of the citizens of Batesville,
® Arkansas and this ordinance therefore being necessary for the
preservation of the public peace, health and safety, emergency
is hereby declared to exist and this ordinance shall take
effect and be in full force from and after its passage and
approval .
PASSED: A N i-2 ! L 2q, 199C APPROVED
;� AYOR
ATTEST: 1�
CITY CLE K