Loading...
HomeMy WebLinkAbout875Irmo, ORDINANCE NO. 7 5 AN ORDINANCE ESTABLISHING QUAIL VALLEY SEWER IMPROVEMENT DISTRICT NO. 1 OF BATESVILLE, ARKANSAS WHEREAS, parties claiming to be the owners of more than a majority in assessed value of the real property located within the territory hereinafter described have filed a petition praying that an improvement district be established for the purposes hereinafter set out; and WHEREAS, after due notice as required by law, the City Council of Batesville, Arkansas, has heard all the parties desiring to be heard, and has ascertained that said petition was signed by more than a majority in assessed value of the owners of real property within said territory; now, therefore, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BATESVILLE, ARKANSAS: SECTION 1. There is hereby established an improvement district embracing the following property in the City of Batesville, Arkansas, to -wit: `'NOW Part of the Southeast Quarter cfthe Northwest Quarter (SE4 NW4) of Section 13, Township 13 North, Range 6 West, to -wit: Begin at a rock for the center corner of Section 13, run N. 000 49' 53" E. along the east line of the said SE4 NA a distance of 1025.84 ft. to the south right-of-way line of Missouri Pacific Railroad Company; then run N. 740 34' W. along said South Railroad right- of-way line 652.80 ft. to a point of curvature; then run 376.29 ft. along a curve to the left, central angle 070 39' and radius 2814.94 ft. to a point of tangency, then run N. 820 09' W. 6.51 ft.; then run S. 000 49' 53" W. 1265.44 ft. to the south line of the said SE4 NW4; then run S. 890 19' 49" E. along the south line of the said SEI -4 NW4 a distance of 1006.84 ft. to the point of beginning, being 26.71 acres; and A tract of land being part of the Northeast Quarter of the Southwest Quarter of Section Thirteen of Township Thirteen North and Range Six West of the Fifth Principal Meridian (NE -14 SW4 Sec. 13, T13N, R6W, 5th P.M.) in Independence County, Arkansas, more particularly described as follows: ... Beginning at the Center of said Sec. 13; thence S. 020 25' 35" W. along the east line of said SW4, a distance of 58.87 feet to a point on the North right-of-way line of State Highway 69; thence beginning on S 750 16' 13" W. on a curve to the left having a 1,949.86 foot radius along said North right-of-way line, a curve distance of 181.56 feet; thence N. 070 58' 42" W., a distance of 122.49 feet; thence S 870 33' 29" E. along the north line of said SW -1-4 a distance of 192.87 feet to the Point of Beginning. Containing 0.38 acres, more or less; and Part of the SW4, Section 13, Township 13 North, Range 6 West, to -wit: Begin at the Southeast corner of the said SW4, run North 74 11' 49" West 284.23 ft.: then run North 680 19' 39" West 393.02 ft.; then run South 890 12' 40" West 190.40 ft.; then run North 870 21' 00" West 1109.60 ft.; then run North 780 10' 20" West 134.20 ft.; then run North 090 00' 00" West 1840.92 ft., to a point on the South right-of-way line of Arkansas Highway 69; then run Southeasterly along said South highway right-of-way line and along a one degree curve to the left, radius 5778.87 ft., a distance of 252.55 ft. to a point of tangency; then run South 760 48' 38" East along said South right-of-way line 376.19 ft.,to a point of curvature; then run Easterly along a five - degree forty-five minute curve to the left, radius 995.45 ft., a distance of 634.95 ft. to a point of tangency; then run North 660 37' 54" East along said South highway right-of-way line 1048.76 ft; then run South 23 22' 06" East 10.00 ft. to a point of curvature on said South highway right-of-way line; then run Easterly along a three -degree curve to the right, radius 1858.83 ft., a distance of 212.71 ft. to the intersection of the said South highway right-of-way line with the East line of the SW4, Section 13, then run South 000 49' 52" West along the quarter -section line 2502.27 ft., to the point of beginning, being 98 acres; and 140W The following platted lots of WOLFORD'S QUAIL VALLEY SUBDIVISION of Part of E2 of SE4 of Section 14, and Part of Wz of SW4 of Section 13, Township 13 North, Range 6 West: Lots 1 to 21 inclusive, of Block One; Lots 1 to 9, inclusive of Block Two; Lots 1 to 11, inclusive, of Block Three; Lots 1 to 14, inclusive, of Block Four; Lots 1 to 10, inclusive, of Block Five; Lots 1 to 13, inclusive, of Block Six; Lots 1 to 10, inclusive, of Block Seven; Lots 1 to 12, inclusive, of Block Eight; for the purpose of constructing a system of sanitary sewer mains and facilities to supply the inhabitants of the above described territory with sanitary sewer service, connecting the sewer system of the district with the sanitary sewer system of the City of Batesville, and, in order to obtain an outlet for the sewer lines of said district, constructing an outfall sanitary sewer line to any proper outlet beyond the boundaries of the district; and the accomplishment of any or all of said above purposes shall be done in such manner, at such time, and with such materials, as the commissioners may deem to be for the best interest of the district. The costs thereof shall be assessed and charged upon the real property hereinabove described. Said district shall be known as Quail Valley Sewer Improvement District No. 1 of Batesville, Arkansas, and Terry Hotten, Verlin Cantrell and Bennie Green are hereby named commissioners, who shall compose the Board of Improvement for said District. SECTION 2. This ordinance shall take effect and be in force '`W from and after its passage., Passed: -` t 1977. 4 APPROVED: ATTEST: Now r i City Clerk Mayor