My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1990-04-03
CITY-OF-BATESVILLE
>
City Clerk
>
Ordinances
>
1990
>
1990-04-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2016 11:37:39 AM
Creation date
6/3/2016 11:37:30 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South along the West line of said Lot 13 and the West <br /> line of said Lot 12 to the Southwest corner of said Lot <br /> 12 ; thence East along the South line of said Lot 12 to <br /> the Southeast corner of said Lot 12 and the point of <br /> beginning. <br /> and property owners desiring or directed to make a connection <br /> with any sewer system resulting in sewage passing through any <br /> part of said sanitary sewer system proposed to be constructed <br /> by the City of Batesville may make such connections upon the <br /> payment of a connection fee to the Batesville Utilities <br /> Commission. <br /> SECTION 2 . A portion of said sanitary sewer system that <br /> Batesville Utilities Commission is planning to install <br /> beginning on about June 15 , 1990 shall be hereafter known as <br /> ® the Big Pine Addition, Phase II Sewer Line and the remainder of <br /> such sanitary sewer system including any and all sanitary sewer <br /> collection lines will empty into said Big Pine Addition, Phase <br /> II Sewer Line either directly or indirectly shall be known <br /> hereafter as Big Pine Addition, Phase II Sanitary Sewer <br /> Collection Lines. The plans and specifications for each and <br /> all of such lines shall be submitted to the Utilities <br /> Commission of the City of Batesville, Arkansas for approval and <br /> each and all of such sanitary sewer collection lines shall be <br /> constructed according to such plans and specifications under <br /> the supervision of the Batesville Utilities Commission and the <br /> Engineers for the Batesville Utilities Commission. Fees <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.