My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1990-04-03
CITY-OF-BATESVILLE
>
City Clerk
>
Ordinances
>
1990
>
1990-04-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2016 11:37:39 AM
Creation date
6/3/2016 11:37:30 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
collected for sewer connection of said trunk line and for <br /> connections resulting from sewage passing through any part of <br /> said trunk line shall be paid to the Batesville Utilities <br /> Commission, until the full amount of construction costs of Big <br /> Pine Addition, Phase II Line have been fully paid; and all fees <br /> collected after that time shall be regulated by and shall <br /> belong to the Batesville Utilities Commission provided, <br /> however, no further connection fees shall ever be assessed <br /> against any single family residence for which fees for sewer <br /> connection as provided 'herein have been paid. <br /> SECTION 3 . Upon approval of the plans and specifications <br /> and construction of the Big Pine Addition, Phase II sewer <br /> system, including the Big Pine Addition, Phase II Sewer Line <br /> and Sanitary Sewer Collection Lines including each and every <br /> sanitary sewer line hereafter connected with this system or <br /> connected so as to cause sewage to pass through any part of the <br /> system, the Batesville Utilities Commission shall accept the <br /> Y � p <br /> same for operation and maintenance and assume responsibility <br /> for and shall bear the costs and expense of operating and <br /> maintaining said Big Pine Addition, Phase II Sewer Line and <br /> each and all of the sanitary sewer collection lines in a proper <br /> and efficient manner. <br /> SECTION 4 : The connection fee authorized in Section 1 of <br /> this ordinance to be paid to the Batesville Utilities <br /> Commission is hereby fixed at $3 , 000 .00 for each single family <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.