My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-01-01
CITY-OF-BATESVILLE
>
City Clerk
>
Ordinances
>
1993
>
1993-01-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2016 2:06:51 PM
Creation date
6/3/2016 2:06:03 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 18 <br /> (5) Statement of applicability of civil, criminal, and <br /> • administrative penalties for violation of pretreatment <br /> standards and requirements, and any applicable <br /> compliance schedule. Such schedule may not extend the <br /> time for compliance beyond that required by applicable <br /> Federal, State, or local law. <br /> B. Wastewater discharge permits may contain, but need not be <br /> limited to, the following: <br /> ( 1) Limits on the average or maximum rate of discharge, <br /> time of discharge, or requirements for flow regulation <br /> and equalization. <br /> (2 ) Limits on the instantaneous, daily and monthly average <br /> or maximum concentration, mass, or other measure of <br /> identified wastewater pollutants or properties . <br /> (3 ) Requirements for the installation of pretreatment <br /> technology, pollution control, or construction of <br /> appropriate containment devices, designed to reduce, <br /> eliminate, or prevent the introduction of pollutants <br /> into the treatment works. <br /> (4 ) Development and implementation of spill control plans <br /> or other special conditions including management <br /> practices necessary to adequately prevent accidental, <br /> unanticipated, or routine discharges . <br /> (5 ) Development and implementation of waste minimization <br /> plans to reduce the amount of pollutants discharged to <br /> the POTW. <br /> ( 6 ) The unit charge or schedule of industrial user charges <br /> and fees for the management of the wastewater <br /> discharged to the POTW. <br /> (7 ) Requirements for installation and maintenance of <br /> inspection and sampling facilities and equipment. <br /> ( 8) A statement that compliance with the wastewater <br /> discharge permit does not relieve the permittee of <br /> responsibility for compliance with all applicable <br /> Federal and State pretreatment standards, including <br /> those which become effective during the term of the <br /> wastewater discharge permit. <br /> ( 9 ) Other conditions as deemed appropriate by the Manager <br /> to ensure compliance with this ordinance, and State and <br /> Federal laws, rules, and regulations . <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.