Laserfiche WebLink
Page 22 <br /> B. A municipal wastewater discharge permit shall contain the <br /> • following conditions: <br /> ( 1) A requirement for the municipal user to adopt a sewer <br /> use ordinance which is at least as stringent as this <br /> ordinance and local limits which are at least as <br /> stringent as those set out in Section 2 .4 . <br /> (2 ) A requirement for the municipal user to submit a <br /> revised industrial user inventory on at least an annual <br /> basis . <br /> ( 3 ) A requirement for the municipal user to: <br /> (a) conduct pretreatment implementation activities <br /> including industrial user permit issuance, <br /> inspection and sampling, and enforcement; or <br /> (b) authorize the POTW to take or conduct such <br /> activities on its behalf . <br /> (4 ) A requirement for the municipal user to provide the <br /> Batesville Utilities Commission with access to all <br /> information that the municipal user obtains as part of <br /> its pretreatment activities. <br /> • (5 ) Limits on the nature, quality, and volume of the <br /> municipal user's wastewater at the point where it <br /> discharges to the POTW. <br /> (6 ) Requirements for monitoring the municipal user's <br /> discharge. <br /> C. Violation of the terms and conditions of the municipal <br /> user's wastewater discharge permit subjects the municipal <br /> user to the sanctions set out in Sections 10 through 12 . <br />