My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1993-01-01
CITY-OF-BATESVILLE
>
City Clerk
>
Ordinances
>
1993
>
1993-01-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2016 2:06:51 PM
Creation date
6/3/2016 2:06:03 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 23 <br /> SECTION 6 - REPORTING REQUIREMENTS <br /> 6 . 1 Baseline Monitoring Reports <br /> A. ( 1 ) Within either 180 days after the effective date of a <br /> categorical pretreatment standard, or the final <br /> administrative decision on a category determination under 40 <br /> CFR 403 . 6 (a) (4 ) , whichever is later, existing significant <br /> industrial users subject to such categorical pretreatment <br /> standards, and currently discharging to or scheduled to <br /> discharge to the POTW, shall be required to submit to the <br /> Manager a report which contains the information listed in <br /> paragraph B, below. At least ninety ( 90 ) days prior to <br /> commencement of their discharge, new sources, and sources <br /> that become industrial users subsequent to the promulgation <br /> of an applicable categorical standard, shall be required to <br /> submit to the Manager a report which contains the <br /> information listed in paragraph B, below. A new source <br /> shall also be required to report the method of pretreatment <br /> it intends to use to meet applicable pretreatment standards. <br /> A new source shall also give estimates of its anticipated <br /> flow and quantity of pollutants discharged. <br /> ( 2 ) Within 180 days after the adoption of any change in a <br /> pretreatment standard other than a categorical pretreatment <br /> standard as defined in 6 . 1 A. 1 above, which adoption may be <br /> by Federal Regulation, the State Statute, or by Batesville <br /> co Ordinance, existing significant industrial users subject to <br /> such pretreatment standard, and currently discharging to, or <br /> scheduled to discharge to the POTW, shall be required to <br /> submit to the Manager a report which contains the <br /> information listed in Subsection 6 . 1 B, below. At least <br /> ninety ( 90) days prior to commencement of their discharge, <br /> new sources, and sources that become industrial users <br /> subsequent to the promulgation of an applicable pretreatment <br /> standard, shall be required to submit to the Manager a <br /> report which contains the information listed in Subsection <br /> 6 . 1 B, below. A new source shall also be required to report <br /> the method of pretreatment it intends to use to meet <br /> applicable pretreatment standards . A new source shall also <br /> give estimates of its anticipated flow and quantity of <br /> pollutants discharged. <br /> B. The industrial user shall submit the information required by <br /> this section including: <br /> ( 1) Identifying Information. The name and address of the <br /> facility including the name of the operator and owners. <br /> ( 2 ) Wastewater Discharge Permits . A list of any <br /> environmental control wastewater discharge permits held <br /> by or for the facility. <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.