71 124181 Regulations 11,015 11,016 Regulations 71 tz-1111
<br /> (1 S "I,am" means any structure for result In a significant change in the normal
<br /> (
<br /> impuundmg or arverunq water; maximum surface arca or the normal 't)The applicant is a(Citizen of the til Wiled S'tatCs,association of citizens
<br /> (2)"FxtsUng dam"means any dam that has maximum, surface elevation of an existing Of the United States, domestic corporation, municipality, or state, as
<br /> been completely cons(ructed; Impoundment;and appropriate,see 16 U-S.C.796).
<br /> {3) "Existing impoundment" means any (iv) Does not, include any proposed new (5)(i) The statutory or regulatory requirements of the state(s) in which
<br /> tx>,ly of water that an existing dam impounds; w.velopmenl or change in project operation the project Would be located and thaL affect the project as proposed, with
<br /> 44 "In;tia; orense" means the first!,cense t,sat would result in a significant
<br /> issued for a water power project under either ervtronm vial impact, respect to bed and banks and to the appropriation,diversion,and use of water
<br /> the Federai Wi.ter Power Act of 1920 or the for power purposes,and with respect to the right to engage in the business of
<br /> (G) "flew development" means any
<br /> Federal Power Act, developing, transmitting, and distributing power and in any other business
<br /> cunstructiun, Installation, repair,
<br /> (5)"Major pr,aect—exist nr;Ilan" means a reconstruction,or Other change in the existing necessary Lo accomplish the purposes of the license under the Federal Power
<br /> licensed or unlicensed, existing or proposed Act, are: (Provide citation and brief identification of the nature of each
<br /> water lower project that, as proposed to be sla,e,>:;.m,cct works or appurtenant facilities,
<br /> license inci,.ding any dredging and filling in project requirement; if the applicant is a municipality, the applicant must submit
<br /> (i) wou.d have a Iota; installed generating waters;and Copies of app:icabie state and local taws or a municipal charter, or, if such
<br /> capacity of more than 2,(X11 hp t i.5 M\V), (7) "New license" means any license for a laws or documents are not clear,other appropriate legal authority,evidencing
<br /> (nl would not use the water power po;cntial +ater ;rower project that ,s muco under the that the municipality is competent under such laws to engage in the business
<br /> provided by any dam except an existing gam, redera: Prwe:Act atter the wuial license for of developing,lransmitting,utilizing,or distributing power.]
<br /> (Ott Dors nut Include any proposea repair or that projc,:t, except ars annual license issued
<br /> reconstruction of an existing dam that would under section 15 of the Federal Power Act. (it)The steps which the appkcant has taken or plans to take to comply
<br /> with each of the laws cited above are: (provide brief description for each law).
<br /> (�
<br /> lzT ,0.rl5-1 (6;The applicant must provide the name and address of the owner of any
<br /> L is
<br /> existing project facilities. If the dam is federally owned or operated, provide
<br /> §4.51 Contents of application. the name of the agency.
<br /> An application for license unuer this s.ii;part must contain the following
<br /> information in the form specified.As provided in paragraph(f)of this section, (h}Exhibit is a description of the project.This exhibit need not include
<br /> the appropriate Federal, state, and local resource agencies must be given the information project works maintained and operated the U.S. Army
<br /> opportunity to comment on the prodosed project, prior to filing of the Corps o; Engin pneers, the Bureau of Reclamation, or any othh er department o
<br /> o
<br /> application for license for major project—existing dam. Information from the agency of the United States,except for any protect works that are proposed to t '
<br /> consultation process must be included in this F,xhibit E,as appropriate. be altered or moclified. If the project includes more than one dam with
<br /> associated facilities, each dam and Lhc associated component parts must be
<br /> (it) Initial statement. described together as a discrete deveiopment. The description for each
<br /> Before the Federal Energy Regulatory Commission development musL contain:
<br /> Applica lion for License for Mijur Project—Existing Dam (i) The physical composition, dimensions, and general configuration of,
<br /> any dams, spillways, penstocks, powerhouses, tailraces, or other structures,
<br /> (1) (Name of appiicant) applies :o the Federal Energy Regulatory whether existing or proposed,to be included as part of the project;
<br /> Commission for a (license ur new :(cense, as appropriate) for the (name of
<br /> project) water power project, as described in the attached exhibits. (Specify (2) The normal maximum surface area and normal maximum surface
<br /> any previous FERC project number designation.) elevation(mean,sea level),gross storage capacity,and usable storage capacity
<br /> (2)The location of the project is: of any impoundments to be included as part of the project;
<br /> (3)The number, type, and rated capacity of any turbines or generators,
<br /> State or territory: ... ................................................... whether existing or proposed,to be included as part of the project;
<br /> County: ....................................................•............
<br /> (4) The number, length, voltage, and interconnections of any primary
<br /> Township or nearby town: ............................................... transmission lines, whether existing or proposed, to be included as part of the
<br /> Stream or other body of water: .,....,.................................... project(see 16 U.S.C.796(1 I));
<br /> (3)The exact name and business address of the applicant are: (5) The specifications of any additional mechanical, electrical, and
<br /> ............................................................
<br /> transmission equipment appurtenant to the project;and
<br /> The exact name and business address of each person authorized to act as (6) Ali lands of the United States that are cr. osrd Wallin the project
<br /> boundary described under daragraph(h)of this section(Exhibit G), identified
<br /> agent for the applicant in this application are: and tabulated by lega: subdivisions of a public land survey of the affecter'
<br /> ................................ area or, in the absence of a public land survey, by the best available legal
<br /> Federal Energy Regulatory Commission §4.51 1f 12,051 T 12,051 § 4.5'51 Federal Energy Guidelines
<br /> M3 V GAS :I
<br />
|