71 12-1.81 Regulations 1-1,017 11,018 Regulations 71 12-1,81
<br /> description_The tabulation must show the total acreage of the lands of the (i)Commencement and completion of construction or installation;
<br /> United States within the project boundary. (ii)Commencement of commercial operation;and
<br /> (c)Exhibit B is a statement of project operation and resource utilization. (iii)Any additions or modifications other tnan routine maintenance;and
<br /> If the project includes morc than one dam with associated facilities, the
<br /> information must be provided separately for each such discrete development. (2) If any new development is proposed,a ollowi g schedule describing
<br /> The exhibit must contain: the necessary work and specifying the intervals Following issuance of a license
<br /> when the work would be commenced and completed.
<br /> (t) A statement whether operation of the powerpiant wi;l be manual or
<br /> automatic,an estimate of the annual plant factor,and a statement of how the (e)Exhibit D is a statement of costs and financing.The statement must
<br /> protect will be operated during adverse,mean,and high water years; contain:
<br /> (2) An estimate of the dependable capacity and average annual energy (1) If the application is for an initial license, a tabulated statement
<br /> production in kilowatt-hours(or a mechanical equivalent), supported by the providing the actual or approximate original cost(approximate costs must be
<br /> following data: identifiect as such)of:
<br /> (i)The minimum, mean, and maximum recorded flows in cubic feet per (i)Any land or water right necessary to the existing project;and
<br /> second of the stream or other body of water at the powerpiant intake or point (ii) Each existing structure and facility described under paragraph(b)of
<br /> of diversion, with a specification of any ad;ustments made for evaporation, this section(Exhibit A),
<br /> leakage, minimum flow releases (including e uration of releases), or other o
<br /> reductions in available flow; a flow du.ation curve indicating the period of {2) I, the applicant is a licensee applying far a new license,and is not a
<br /> recon and the gauging stations used in deriving the curve;and a specification muunici,)ality or a state,an estimate of the amount which would be payable if
<br /> of the period of critical streamflow used to determine the dependable the project were to be taken over pursuant to section 14 of the Federal Power
<br /> capacity; Act upon expiration of the license in effect fsee iG U.S.C.807],including:
<br /> (,i)An area-capacity curve showing the gross storage capac;ty and usable (i)Fair value;
<br /> storage capacity of the impoundment,with a rule curve showing the proposed (ii)Net investment;and
<br /> operation of the impoundment and how the usable storage capacity is to be
<br /> {iii}Severance damages.
<br /> utilized;
<br /> (iii)The estimated hydraulic capacity of the powerpiant(maximum flow (3) If the application includes proposals for any new development, a
<br /> through the powerpiant)in cubic feet per second; statement of estimated costs,including;
<br /> (iv)A tailwater rating curve;and (i) The cost of any land or water rights necessary to the new
<br /> development;and
<br /> (v) A curve showing powerpiant capability versus head and specifying
<br /> maximum,normal,and minimum heads, (ii)The cost of the new development work,with a specification of:
<br /> (3) A statement, with load curves and tabular data, if necessary, of the (A)Total cost of each major item,
<br /> manner in which the power generated at the project is to be utilized,including (13) indirect construction costs such as costs of construction equipment,
<br /> the arnouni of power to be used onsite,if any,the amount of power to be sold, camps,and commissaries;
<br /> and the identity of any proposed purchaser s;and
<br /> (C)Interest during construction;and
<br /> (4) A statement of the addlicant's pians, if any, for future development
<br /> of the project or of any other existing or proposed water power project on the f ) Overhead, construction, legal expenses, taxes, administrative and
<br /> general expenses,and contingencies.
<br /> stream or other body of water, indicating the approximate location and
<br /> estimated installed capacity of the proposed developments- (4)A statement of the estimated average annual cost of the total project
<br /> (d) Exhibit C is a construction history and proposed construction as proposed,specifying any projected changes in the costs over the estimated
<br /> schedule far the project.The construction history and schedules must contain: financing or licensing period if the applicant takes such changes into account,
<br /> including:
<br /> (I) If the application is for an imtisi license, a tabulated chronology of
<br /> construction for the existing prysects structures and facilities described under (i)Cost of capital(equity and debt);
<br /> paragraph (b) of this section {Exhibit A), specifying for each structure or (ii)Local,state,and Federai taxes;
<br /> facility, to the extent possioie, the actual or approximate dates(approximate
<br /> dates must be identified as such)of: (iii)Depreciation or amortization;and