Laserfiche WebLink
71 12-1.81 Regulations 1-1,017 11,018 Regulations 71 12-1,81 <br /> description_The tabulation must show the total acreage of the lands of the (i)Commencement and completion of construction or installation; <br /> United States within the project boundary. (ii)Commencement of commercial operation;and <br /> (c)Exhibit B is a statement of project operation and resource utilization. (iii)Any additions or modifications other tnan routine maintenance;and <br /> If the project includes morc than one dam with associated facilities, the <br /> information must be provided separately for each such discrete development. (2) If any new development is proposed,a ollowi g schedule describing <br /> The exhibit must contain: the necessary work and specifying the intervals Following issuance of a license <br /> when the work would be commenced and completed. <br /> (t) A statement whether operation of the powerpiant wi;l be manual or <br /> automatic,an estimate of the annual plant factor,and a statement of how the (e)Exhibit D is a statement of costs and financing.The statement must <br /> protect will be operated during adverse,mean,and high water years; contain: <br /> (2) An estimate of the dependable capacity and average annual energy (1) If the application is for an initial license, a tabulated statement <br /> production in kilowatt-hours(or a mechanical equivalent), supported by the providing the actual or approximate original cost(approximate costs must be <br /> following data: identifiect as such)of: <br /> (i)The minimum, mean, and maximum recorded flows in cubic feet per (i)Any land or water right necessary to the existing project;and <br /> second of the stream or other body of water at the powerpiant intake or point (ii) Each existing structure and facility described under paragraph(b)of <br /> of diversion, with a specification of any ad;ustments made for evaporation, this section(Exhibit A), <br /> leakage, minimum flow releases (including e uration of releases), or other o <br /> reductions in available flow; a flow du.ation curve indicating the period of {2) I, the applicant is a licensee applying far a new license,and is not a <br /> recon and the gauging stations used in deriving the curve;and a specification muunici,)ality or a state,an estimate of the amount which would be payable if <br /> of the period of critical streamflow used to determine the dependable the project were to be taken over pursuant to section 14 of the Federal Power <br /> capacity; Act upon expiration of the license in effect fsee iG U.S.C.807],including: <br /> (,i)An area-capacity curve showing the gross storage capac;ty and usable (i)Fair value; <br /> storage capacity of the impoundment,with a rule curve showing the proposed (ii)Net investment;and <br /> operation of the impoundment and how the usable storage capacity is to be <br /> {iii}Severance damages. <br /> utilized; <br /> (iii)The estimated hydraulic capacity of the powerpiant(maximum flow (3) If the application includes proposals for any new development, a <br /> through the powerpiant)in cubic feet per second; statement of estimated costs,including; <br /> (iv)A tailwater rating curve;and (i) The cost of any land or water rights necessary to the new <br /> development;and <br /> (v) A curve showing powerpiant capability versus head and specifying <br /> maximum,normal,and minimum heads, (ii)The cost of the new development work,with a specification of: <br /> (3) A statement, with load curves and tabular data, if necessary, of the (A)Total cost of each major item, <br /> manner in which the power generated at the project is to be utilized,including (13) indirect construction costs such as costs of construction equipment, <br /> the arnouni of power to be used onsite,if any,the amount of power to be sold, camps,and commissaries; <br /> and the identity of any proposed purchaser s;and <br /> (C)Interest during construction;and <br /> (4) A statement of the addlicant's pians, if any, for future development <br /> of the project or of any other existing or proposed water power project on the f ) Overhead, construction, legal expenses, taxes, administrative and <br /> general expenses,and contingencies. <br /> stream or other body of water, indicating the approximate location and <br /> estimated installed capacity of the proposed developments- (4)A statement of the estimated average annual cost of the total project <br /> (d) Exhibit C is a construction history and proposed construction as proposed,specifying any projected changes in the costs over the estimated <br /> schedule far the project.The construction history and schedules must contain: financing or licensing period if the applicant takes such changes into account, <br /> including: <br /> (I) If the application is for an imtisi license, a tabulated chronology of <br /> construction for the existing prysects structures and facilities described under (i)Cost of capital(equity and debt); <br /> paragraph (b) of this section {Exhibit A), specifying for each structure or (ii)Local,state,and Federai taxes; <br /> facility, to the extent possioie, the actual or approximate dates(approximate <br /> dates must be identified as such)of: (iii)Depreciation or amortization;and <br /> Federal Energy Regulatory Commission 4.51 1112,051 is 12+051 §4,51 Fedora)Energy fiutda3jnes <br /> oox 11 <br /> I <br />