71 11-1-111 Regulations 1r3 11+024 Regulations
<br /> (D) A map or drawing that conforms to the size, scale, and legibility (g) Exhibit F consists of general design drawings of the principal project
<br /> requirements of§4.32 showing by the use of shading,cross-hatching,or other works described under paragraph (b) of this section (Exhibit A) and
<br /> symbols the identity and location of any facilities, and indicating whether supporting information used to demonstrate that existing project structures
<br /> each facility is existing or proposed(the maps or drawings in this exhibit may are safe and adequate to fulfill their stated functions.
<br /> be consolidated);and (1) The drawings must show all major project structures in sufficient
<br /> (vi) A description of any areas within or in the vicinity of the proposed detail to provide a full understanding of the project,including:
<br /> project boundary that are included in, or have been designated for study for (i)Plans(overhead view);
<br /> inclusion in, the \'..tiunal Wild and Scenic Rivers System, or that have been (ii)Elevations(front view);and
<br /> designated as wilderness arca, recommended for such designation, or
<br /> designated as a wilderness study area under the Wilderness Act. (iii)Sections(side view).
<br /> (6) Report on land management and aesthetics, The report must discuss (2)Supporting design report.The applicant must furnish,at a minimum,
<br /> the management of land within the proposed project boundary, including the following supporting information to demonstrate that existing structures
<br /> wetlands and fiooclpiains, and the protection of the recreational and scenic are safe and adequate to fulfiil their stated functions, and must submit such
<br /> values of the project.The report must be prepared following consultation with information in a separate report at tate time the application is filed. The
<br /> local and state zoning and land management authorities and any Federal or report must include:
<br /> state agency with managerial authority over any part of the project lands. (i) A description of the physical condition or state of maintenance and
<br /> Consultation must be documented by appending to the report a letter from repair of any existing and proposed structures or equipment;and
<br /> each agency consulted indicating the nature, extent, and results of the iii) Information relating to composition and competency of foundations
<br /> consultation.The report must contain: and other structures, gradation of filter and riprap material, design strength
<br /> (i) A description of existing development and use of project lands and ail and ultimate strength of concrete and steel, stress and stability analysis,
<br /> other lands abutting the project impoundment; spillway rating curves,water levels,and Other appropriate data.
<br /> (ii) A description ;f the measures proposed by the applicant to ensure (3)The applicant must submit five copies of the supporting design report
<br /> that any proposed project works, rights-of-way, access roads, and other as described in subparagraph (2) of this paragraph (rather than the fourteen a
<br /> topographic alterations blend, to the extent possible, with the surrounding copies required under §•1.31(b) of the Commission's regulations) at the time QO
<br /> envirunrnerit;(see,e.g.,44 1:.P.C, 1496,et seq.); general design drawings are submitted to the Commission for review.
<br /> (iii) A description of wetlands or floodplains within, or adjacent to, the (h) Exhibit G is a map of tie project. The map must conform to the
<br /> prujcct boundary,any short-term or long-term impacts of the project on those specifications of §4.32. If more than one sheet is used, the sheets must he
<br /> wetlands or flooiplains, and any mitigative measures in the construction or numbered consecutively and each sheet must bear a small inset sketch
<br /> uperaLion of the project that minimize any adverse impacts on the wetlands or showing the entire project (or devciopment) and indicating the portion
<br /> fiaxiplains; depicted on the sheet.The map must show:
<br /> i,iv, A statement, including an analysis of costs and other constraints,of {1) Location of the project and principal features. The map must show
<br /> the appi,cant's abiiay to provide a buffer zone around all or any part of the the location of the project as a whole with reference to the affected stream or
<br /> Impoundment, for the h.rrpose of ensuring public access to project lands and other body of water and, if possible, to a nearby town or any permanent
<br /> waters and protecting the recreational and aesthetic values of the monuments or objects, such as roads, transmission lines or other structures,
<br /> impoundment and its shoreline; that can be noted on the map and recognized in the field, the map must also
<br /> show the relative iocanom and phvsicai interrelationships of the principal
<br /> (i°! A description of the applicant's policy, if any, with regard toproject works and other features described under paragraph(h)of this secii in
<br /> permitting &%'dupment of piers, docks, boat landings, bulkheads, and other (Exhibit A).
<br /> shoreline facilities on project lands and waters;and
<br /> (2) Project huundanV. The map must show project boundar}�enchisutg
<br /> (vii Maps or drawings that coliform to the size, scale and legibility all of the principal protect works anti other features dcsrrilwd under
<br /> requirements of §432, or phutographs, sufficient to show the location and paragraph (b) of this scetion tExhibit At, The boundary must enclose only
<br /> nature of the measures prUlwsed under paragraph (f)(6)(ii) of this section those; lands necessary for operatxm and maintenance of the protect and for
<br /> (maps or drawings in this exhibit may be consolidated), odher project purposes, such as recreation, ,horcline control, or protection, of
<br /> environmental resources (.see paragraph (f) of this section (Exhibit E.)).(7) List of literature. The report must include a list of all publications,
<br /> reports, and other literature wloiri were cited or otherwise utilized in the i;x,isting residential, commercial, ur other structures may be included within
<br /> preparation of any part of the environmental report tthe boundary only to the extent that underlying ;ands are ncedol for project
<br /> Federal Energy Regulatory Commission §4.51 f 12,051 1, 12,051 § 4.51 Federal Energy Guidelines
<br /> dw 71
<br /> 1
<br /> t
<br />
|