<br /> 71 12.1-81 Regulations 11,025 11,026 Regulations 71 12,1-81
<br /> purposes(e.g.,for flowage,public recreatlon,shoreline control,or protection of (i) By legal subdivisions of a public lanai survey of the affected area (a
<br /> environmental resources). If the boundary is on land covered by a public land protraction of identified township and section lines 45 Sufficient for this
<br /> survey,ties must be shown on the map at sufficient points to permit accurate purpose);
<br /> platting of the position of the boundary relative to the lines of the public land (ii)By the Federal agency,identified by symbol or legend if desired,that
<br /> survey. If the lands are not covered by a public land survey the best available maintains or manages each identified subdivision of the public land survey
<br /> legal description of the position of the boundary must be provided, including within the project boundary;and
<br /> distances and directions from fixed monuments or physical features. The (iii) In the absence of a public land survey,by the location of the Federal
<br /> boundary must be described as follows: lands according to the distances and directions from fixed monument~ or
<br /> (i) Impoundments. (A) The boundary around a project impoundment physical features.When a federal survey monument or a Federal hunch mark
<br /> may be described by any of the following: will be destroyed or rendered unusable by the construction of project works,iii
<br /> least two permanent, marked, witness monuments or bench marks must he
<br /> {1}Contour lines,including the contour elevation(preferred method); established at accessible points. Tire maps must show the location (and
<br /> (2)Specified courses and distances(metes and bounds); elevation,for bench marks)of the survey monument or bench mark which wi 1
<br /> (J) If Cie project lands are covered by a public land survey,lines upon or be destroyed o, rendered unusable, as wei, as of the witness monuments or
<br /> parallel to the lines of the survey;or bench marks. Connecting courses and distances from the witness monuments
<br /> or bench marks to the original must also be shown.
<br /> (4)Any combination of the above methods.
<br /> (4) Nun-Federal hands. For those lanais within the project boundary not
<br /> (B) The boundary must be located no more than 200 feet (horizontal identified under paragraph (h)(3) of this section, the map must identify by
<br /> measurement) from ,he exterior margin of the reservoir, defined by the legal subdivision:
<br /> normal maximum surface elevation, except where deviations may be (i) Lands owned in fee by the applicant and lands that the applicant
<br /> necessary in describing t;e boundary according to the above methods, or
<br /> where additional lands are necessary for project purposes, such as public pians to acquire in fee;and
<br /> recreation,shoreline control,or protection of environmental resources. (it) Lands over which the applicant has acquired or plans to acquire
<br /> (ii) Continuous features. The boundary around linear ("continuous") rights to occupancy and use other than fee title, inciuding rights acquired or
<br /> to be acquired by easement or lease.
<br /> project features such as access roads,transmission lines,and conduits may be
<br /> described by specified distances from center lines or offset lines of survey.The .01 lntruductory paragraph,46 F.R 55926 an instrument in writing,ceruticd copy of such
<br /> width of such corridors must not exceed 200 feet, unless good cause is shown (Novemfier 13, 1'361), subsection(a),40 F R instrument,or in lieu thereof,if such a cony is
<br /> for a greater width.Several sections of a continuous feature may be shown on 55245(Novcrnlwr 9, 1=)231.),subsection(h)-(c), of record in airy. department of the United
<br /> 44 F R 67644 tNo,embcr 27, 1979), States Government at Washmgton, a state AM
<br /> -
<br /> a single sheet.,with information Showing the sequence of contiguous sections, suiisectwn (f), Ori F R 55926(November 13, meni iii that effect and reference thereto
<br /> (iii) Noncontinuous features. (A) The boundary around nonconttnuous hast), subsection (g),46 F.R W27(January Exhibit Q A siatement setting forth a brwf
<br /> project works such as dams,spillways,and powerhouses may be described by: 2$,1981) history of clic project works already.05 ,tt;sroricat record.—Section 4.51 constrt;ctea, giving time of commencemeni
<br /> (I)Contour lines; originated in 12 F.R.8485(12/19/47),and and of completion of construction of the
<br /> was amended in 44 F.R.61328(10/25/79), several parts thereof, [late of commencement
<br /> (2)Specified courses and distances; effective 11/26/79, of operation,anu method of financing.
<br /> Section 4.51,appearing in 44 F.R.61328 CRon itr:rttxr.ut t:: Fur specifications for
<br /> (3) If the project lands are covered by a public land survey,lines upon or (10/25/79), effective 11/26/79, read as ,frau cgs,see§4.32
<br /> parallel to the lines of the survey;or follows until its amendment in 44 F,R. The introductory paragraph to Section
<br /> 67644(11/27/79),effective l/1/80: 4.51,appearing in 44 F.R.67644(11/27/79),
<br /> (4)Any combination of the above methods, Sec.4,51 Additional exhibits. effective i/l/80,read as follows until it was
<br /> (B) The boundary must enclose only those Lands that are necessary for The failawixig additional exhibits shalt be amended in 46 F.R. 55926 (11/13/81),
<br /> r
<br /> safe and efficient operation and maintenance of the project, or for other furnished. effective 12/14/81:
<br /> Exhibit P. A statement of the nature and Each appticatsur, for a License for a major
<br /> specified project purposes, such as public recreation or protection of character of the permit,nght-of•way,or other product--existing dam must be prepared after
<br /> environmental resources. authority,if any isee sec.23(a),49 Stat_846, consultation with the appropriate state public
<br /> (3)Federal lands.Any public lands and reservations of the United States 16 U S.C. 816;, claimed to be held by.the service commission or board and the other
<br /> applicant. This statement shall be Federal,State,and local agencies specified in
<br /> (see 16 U.S.C. 796(1) and (2)/ ("federal lands") that are within the project accompanied by copses of or ap;iropriate this section.The applicant may obtain a fist of
<br /> boundary,e.g_,lands administered by the U.S. Forest Service,Bureau of Land references to the tegis:ative authority, if any, agencies to be consulted from the Director of
<br /> Management, National Park Service, or Indian tribal lands, and the by or under which such permit, right-of-way, the Commission's Division of License,"
<br /> boundaries 01 those Federal lands,must be identified on the map: or authority was acquired,and if granted by Projects Each application must include an
<br /> Federal
<br /> ao rt. Energy Regulatory Commisslon �4.51 -1112,051 112,051 §4.51 Federal Energy Guide3net