Laserfiche WebLink
t <br /> 71 12.1-81 Regulations 11,025 11,026 Regulations 71 12,1-81 <br /> purposes(e.g.,for flowage,public recreatlon,shoreline control,or protection of (i) By legal subdivisions of a public lanai survey of the affected area (a <br /> environmental resources). If the boundary is on land covered by a public land protraction of identified township and section lines 45 Sufficient for this <br /> survey,ties must be shown on the map at sufficient points to permit accurate purpose); <br /> platting of the position of the boundary relative to the lines of the public land (ii)By the Federal agency,identified by symbol or legend if desired,that <br /> survey. If the lands are not covered by a public land survey the best available maintains or manages each identified subdivision of the public land survey <br /> legal description of the position of the boundary must be provided, including within the project boundary;and <br /> distances and directions from fixed monuments or physical features. The (iii) In the absence of a public land survey,by the location of the Federal <br /> boundary must be described as follows: lands according to the distances and directions from fixed monument~ or <br /> (i) Impoundments. (A) The boundary around a project impoundment physical features.When a federal survey monument or a Federal hunch mark <br /> may be described by any of the following: will be destroyed or rendered unusable by the construction of project works,iii <br /> least two permanent, marked, witness monuments or bench marks must he <br /> {1}Contour lines,including the contour elevation(preferred method); established at accessible points. Tire maps must show the location (and <br /> (2)Specified courses and distances(metes and bounds); elevation,for bench marks)of the survey monument or bench mark which wi 1 <br /> (J) If Cie project lands are covered by a public land survey,lines upon or be destroyed o, rendered unusable, as wei, as of the witness monuments or <br /> parallel to the lines of the survey;or bench marks. Connecting courses and distances from the witness monuments <br /> or bench marks to the original must also be shown. <br /> (4)Any combination of the above methods. <br /> (4) Nun-Federal hands. For those lanais within the project boundary not <br /> (B) The boundary must be located no more than 200 feet (horizontal identified under paragraph (h)(3) of this section, the map must identify by <br /> measurement) from ,he exterior margin of the reservoir, defined by the legal subdivision: <br /> normal maximum surface elevation, except where deviations may be (i) Lands owned in fee by the applicant and lands that the applicant <br /> necessary in describing t;e boundary according to the above methods, or <br /> where additional lands are necessary for project purposes, such as public pians to acquire in fee;and <br /> recreation,shoreline control,or protection of environmental resources. (it) Lands over which the applicant has acquired or plans to acquire <br /> (ii) Continuous features. The boundary around linear ("continuous") rights to occupancy and use other than fee title, inciuding rights acquired or <br /> to be acquired by easement or lease. <br /> project features such as access roads,transmission lines,and conduits may be <br /> described by specified distances from center lines or offset lines of survey.The .01 lntruductory paragraph,46 F.R 55926 an instrument in writing,ceruticd copy of such <br /> width of such corridors must not exceed 200 feet, unless good cause is shown (Novemfier 13, 1'361), subsection(a),40 F R instrument,or in lieu thereof,if such a cony is <br /> for a greater width.Several sections of a continuous feature may be shown on 55245(Novcrnlwr 9, 1=)231.),subsection(h)-(c), of record in airy. department of the United <br /> 44 F R 67644 tNo,embcr 27, 1979), States Government at Washmgton, a state AM <br /> - <br /> a single sheet.,with information Showing the sequence of contiguous sections, suiisectwn (f), Ori F R 55926(November 13, meni iii that effect and reference thereto <br /> (iii) Noncontinuous features. (A) The boundary around nonconttnuous hast), subsection (g),46 F.R W27(January Exhibit Q A siatement setting forth a brwf <br /> project works such as dams,spillways,and powerhouses may be described by: 2$,1981) history of clic project works already.05 ,tt;sroricat record.—Section 4.51 constrt;ctea, giving time of commencemeni <br /> (I)Contour lines; originated in 12 F.R.8485(12/19/47),and and of completion of construction of the <br /> was amended in 44 F.R.61328(10/25/79), several parts thereof, [late of commencement <br /> (2)Specified courses and distances; effective 11/26/79, of operation,anu method of financing. <br /> Section 4.51,appearing in 44 F.R.61328 CRon itr:rttxr.ut t:: Fur specifications for <br /> (3) If the project lands are covered by a public land survey,lines upon or (10/25/79), effective 11/26/79, read as ,frau cgs,see§4.32 <br /> parallel to the lines of the survey;or follows until its amendment in 44 F,R. The introductory paragraph to Section <br /> 67644(11/27/79),effective l/1/80: 4.51,appearing in 44 F.R.67644(11/27/79), <br /> (4)Any combination of the above methods, Sec.4,51 Additional exhibits. effective i/l/80,read as follows until it was <br /> (B) The boundary must enclose only those Lands that are necessary for The failawixig additional exhibits shalt be amended in 46 F.R. 55926 (11/13/81), <br /> r <br /> safe and efficient operation and maintenance of the project, or for other furnished. effective 12/14/81: <br /> Exhibit P. A statement of the nature and Each appticatsur, for a License for a major <br /> specified project purposes, such as public recreation or protection of character of the permit,nght-of•way,or other product--existing dam must be prepared after <br /> environmental resources. authority,if any isee sec.23(a),49 Stat_846, consultation with the appropriate state public <br /> (3)Federal lands.Any public lands and reservations of the United States 16 U S.C. 816;, claimed to be held by.the service commission or board and the other <br /> applicant. This statement shall be Federal,State,and local agencies specified in <br /> (see 16 U.S.C. 796(1) and (2)/ ("federal lands") that are within the project accompanied by copses of or ap;iropriate this section.The applicant may obtain a fist of <br /> boundary,e.g_,lands administered by the U.S. Forest Service,Bureau of Land references to the tegis:ative authority, if any, agencies to be consulted from the Director of <br /> Management, National Park Service, or Indian tribal lands, and the by or under which such permit, right-of-way, the Commission's Division of License," <br /> boundaries 01 those Federal lands,must be identified on the map: or authority was acquired,and if granted by Projects Each application must include an <br /> Federal <br /> ao rt. Energy Regulatory Commisslon �4.51 -1112,051 112,051 §4.51 Federal Energy Guide3net <br /> oto iv <br />