|
71 12-1-81 Regulations 11,027 11,028 Regulations 71 12-1-81
<br /> initial statement and lettered exhibits Before the Federal Energy Regulatory as follows until it was amended in 46 F.R. whether each structure depicted is existing or
<br /> Containing the following information and Commission 55926(11/13/81),effective 12/14/81: proposed. _ -
<br /> documents Application for License for Major Projecl— (f) Exhibit E is an environmental report. (2)Detailed working drawings that chow the
<br /> Subsection (a), appearing in 44 F.R. Existing Dam The report must be prepared in consultation precise plans and specifications
<br /> 67644 (11/27/79),effective 1 1 80, read as (1) (Name of applicant.) applies to the with local, stale, and Federal agencies with s Pnttl for proposed
<br /> / / 11 PV structures should not be filed with the
<br /> follows until it was amended in 46 F.R. Federal Energy Regt.:atnry Commission fora expertise in environmental matters.The names application, but must be prepared for clic
<br /> 9027(1/28/81),effective 2/27/81: (license or new license,as appropriate)for the and, addresses of these agencies may be
<br /> (a)Initial statement. (name of project) water power project, as obtained from the Director, Division of purjwses of construction and, if a license is
<br /> Before the Federal Ener Regulatory described in the attached exhibits. (Specify Licensed projects I( any agency that an issued and construction ensues, retained as
<br /> Energy g rY a permanent project records.
<br /> Commission any previous FERC project number applicant is required to consult falls to provide 1 j
<br /> designation.) to the applicant timely documentation of the (3) The general design drawings required
<br /> Application for License for Major Project— consultation process as set forth in this under thisparagraph must show plans
<br /> ExistingDam (2)The location of the project is:
<br /> paragraph, the applicant may submit a (overhead view), elevations ((root view),
<br /> (1) (Name of applicant) applies to the State or territory: .......................... summaryof the consultation and the profiles
<br /> Federal Energy Regulatory Commission for a County. ....... V (side view), and sections for each
<br /> """"""""""� "� recommendations of the agency. Information principal project work.The drawings must be
<br /> (license or new license•as appropriate) for the Township or nearby town:................... provided in the report must be organized and
<br /> accompanied by a description of the physical
<br /> (name of project) water power project. as Stream or other body of water. ..... ....... referenced according to the provisions of this condition or state of maintenance and repair of
<br /> described in the attached exhibits. (Specify (3)The exact name and business address of paragraph.If a request for information is not any structures or equipment and by sufficient
<br /> any previous FERC project number the applicant are: applicable, the application must explain information relating to composition and
<br /> designation.) ....................I........ ...., .... briefly why it does not apply. The
<br /> (2)The vocation of the project is: The exact name and business address of each environmental report must contain the competency of foundations and other
<br /> State orterritory. .......... .. ...... .. person authorized to act as agent for the following elements structures, gradation of filler and nprap
<br /> Subsection material, design strength and ultimate
<br /> County ...... .............. applicant m this application are. (g), appearing m 44 F.R.
<br /> p nearby town........... 67644 (11/27/79),effective I/l/80, read as strength of concrete and steel, stress and
<br /> Townshi
<br /> ......... ......�P......... ......
<br /> Stream or other body of water ..... ....... (4)Thea applicant is a(citizen of the united follows until it was amended : 46 F.R. Standarity analyses,the project design flood(and
<br /> States, association of citizens of the United 9027(1/28/81),effective 2/27/81: Standard Project Float or Probable Maximum
<br /> at Ttie exact name and business address of States, domestic corporation, municipality, or (g) Exhibit F consists of general design Flood, if different, from the design flood) used
<br /> the applicant are: for stabiirt analysis, spillway ratio curves,
<br /> state,as appropriate,see 16 U S.0 7cX�). drawings of the principal project works 1' Y� P Y R
<br /> described under paragraph(b) of this section water levels, and other controlling factors to
<br /> Tncexact name and business address oteach (5)(i) The statutory or regulatory (Exhibit A) demonstrate that the structures are safe and
<br /> requirements of the statc(s) in which the en
<br /> person authorized to act as agent for the project would be located and that affect the (1) The drawings must conform to the adequate to fulfill their staled(unctions. CD
<br /> applicant in this application are. specifications of 4.32 and must indicate
<br /> project as proposed with respect to tied and �
<br /> . .• banks and to the appropriation,diversion,and
<br /> (4)The applicant is a tatizen of the United use of water for power purposes, and with
<br /> States, association of citizens of the United respect to the right to engage in the business of
<br /> Stales, domestic corporation, municipality,or developing, transmitting, and distributing
<br /> state,as appropriate,see 16 U S C 746) power and in any other business necessary to
<br /> (5)li) The statutory or regulatory accomplish the purposes of the license under
<br /> requirements of the state(s) In which the the Federal Power Act are. (provide citation
<br /> project would be located and that affect the and brie(identification of the nature of each
<br /> project as proposed with respect to bed and requirement).
<br /> banks and to the appropriation,diversion,and (u)The steps which the applicant has taken [The next page is 11,031.]
<br /> use of water for power pur,ores, and with or plans to take to comply with each of the
<br /> respect to the right to engage in the business of laws cited above are:(provide brief description
<br /> developing, transmitting, and distributing for each law)
<br /> power and in any other business necessary to (6) The applicant must provide the name
<br /> accomplish the purposes of the license under. and address of the owner of any existing
<br /> the Federal Power Act are (provide citation project facilities.If the dam is federally owned
<br /> and brief identification of the nature of each or operated,provide the name of the agency
<br /> requirement) Subsection (f), appearing in 44 F.R.
<br /> (i;)The steps which the applicant has taken 67644 (11/27/79), effective 1/1/80, was
<br /> or plans to take to comply with each of the amended in clause (6Xii) in 46 F.R. 9027
<br /> laws cited above are:(provide brief description (1/28/81), effective 2/27/81, by removing
<br /> for each law) the term "(see, e.g.,44 CFR Part 1491,et
<br /> Subsection(a),appearing in 46 F.R.9027 sept",and by inserting in lieu thereof the
<br /> effective 2/27/81,read as follows term"(see,e.g.,44 F.P.C.1496,et seq.)".
<br /> until it was amended in 46 F.R. 55245 Subsection(f),appearing in 46 F.R.9027
<br /> (11/9/81),effective 10/29/81: (1/28/81), effective 2/27/81, was amended
<br /> (a)Initial statement. in its introductory paragraph, which read
<br /> Federal Energy Regulatory Commission §4.51 ¶ 12,051 ¶ 12,051 §4.51 Federal Energy Guidellnes
<br /> 009 51 52, 3o
<br />
|