Laserfiche WebLink
Maxfield Park phases of construction: <br /> Phase 1 to be complete by June 1, 2016: <br /> 1) The Batesville City Council working with Mayor Rick Elumbaugh will pass a resolution <br /> proclaiming the establishment of Maxfield Park. There will be five (5) additional construction <br /> phases after this establishment. A final (7th) phase will be a formal dedication of the park. <br /> 2) Break ground by leveling elevations to proper height in playground area and memorial <br /> fountain/sculpture area. <br /> 3) Do dirt work and leveling in three areas to create approximately 20 parking spaces with a <br /> gravel base. <br /> 4) Erect a temporary sign indicating the location of Maxfield Park. The sign will feature the date <br /> of establishment, and a shortened version of the five (5) following phases. <br /> Phase 2 to be complete by November 1, 2016: <br /> 1) Remove the native stone from existing structure and store in a safe place to be used <br /> throughout the park. <br /> 2) Run water lines to areas that will require a water source. These facilities will require water: <br /> A. Restroom <br /> B. Memorial fountain <br /> C. Waterfall and fish pond <br /> D. Drinking fountain <br /> E. Landscape watering <br /> 3) Install electric breaker panel and run electric conduit to areas that will require electricity. <br /> These facilities will require electrical power: <br /> A. Restroom <br /> B. Memorial fountain <br /> C. Waterfall and fish pond <br />