My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
906
CITY-OF-BATESVILLE
>
City Clerk
>
Ordinances
>
1979
>
906
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/30/2019 4:38:26 PM
Creation date
8/20/2018 3:27:30 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
low -41W <br />r <br />(6) each affected industrial discharge shall <br />f <br />be monitored on a periodic basis but as a minimum <br />once each year to determine flows and loadings; <br />(7) the method of determining the applicable <br />industrial cost recoverT charge shall be in <br />accordance with latest EPA published regulations; <br />(8) all industries affected by this resolution <br />shall have, upon receipt of written notification <br />from the Utilities Commission of a change in ICR <br />i <br />costs, 30 days in which to appeal to the Board the <br />stipulated changes in ICR costs. <br />jj (9) any industry subject to ICR charges may <br />i <br />y <br />remit to the Utilities Commission the appropriately <br />i <br />i' computed charges on either a monthly, quarterly, or, <br />;� LL <br />as a maximum, on a yearly basis. <br />i! <br />'i <br />i! BE IT ORDAINED that the City of Batesville fixes and <br />g neral equations to be used in <br />establishes the following, geq <br />computing and allocating Industrial Cost Recovery charges that <br />shall be paid by all qualifying users of the Batesville Waste- <br />�I <br />;! water System as previously defined, said charges becoming <br />effective fiscal year beginning October 1, 1980. <br />Equation (1) <br />ICR Char es to Flow =(Flow Capital Costs)(Percent_Industrial Use) <br />Useful Life 30 YearsT <br />Where, <br />Percent Industrial Use = Actual Industrial Flow i <br />Plant Design Flow <br />9 <br />Equation (2) <br />i <br />ICR. Charges to BOD = (BOD Capital Costs) (Percent Industrial Use); <br />Useful Life (30 Years) <br />Where, <br />Percent Industrial Use = Actual Industrial BOD, Lbs. <br />Plant Design BOD, Lbs. <br />i <br />0 <br />Equation (3) <br />ICR Charges to <br />Suspended Solids <br />Where, <br />(SS Capital Costs) (Percent Industrial Use) <br />Useful Life 30 Years) <br />Percent Industrial Use = Actual Industrial SS, Lbs. 'f <br />Plant Design SS, Lbs. <br />q <br />
The URL can be used to link to this page
Your browser does not support the video tag.