Laserfiche WebLink
EXHIBIT-1 <br />City of Batesville Public Works Facility <br />Value Engineering Adjustments <br />Date 9/30/2022 <br />1 <br />Office Building —go to typical Pre -Engineered Metal Building(PEMB) <br />-$448 097.00 <br />2 <br />Maintenance Building and Vehicle Storage <br />-$169,105.00 <br />3 <br />Go to 14' x 14' metal back insulated overhead doors with 6' highlift, <br />electric operator <br />-$67,095.00 <br />4 <br />Use alternate lighting package for the high bay fixtures in <br />Maintenance Building and Vehicle Storage <br />-$12,524.00 <br />5 <br />Use aluminum panel feeder conductors <br />-$5,656.00 <br />6 <br />Go to 4" vinyl back fiberglass insulation in Maintenance Building and <br />Vehicle Storage <br />-$10,430.00 <br />7 <br />Landscaping— use $10,000.00 Allowance <br />-$12,000.00 <br />8 <br />Delete stamped concrete between Offices and Maintenance Building <br />-$9 240.00 <br />9 <br />Delete all the trench drains in the Maintenance Building <br />-$84,657.00 <br />Maintenance Building — delete two showers, add two water closets, <br />10 <br />add two toilet paper dispensers <br />$87.00 <br />Maintenance Building — extend two walls in M103 and M109 by 4' <br />11 <br />each. Add light fixtures, glass, masonry, metal roof panels, carpentry, <br />ceiling, paint <br />$4,028.00 <br />12 <br />Move a/c condensing units on Office to sidewalls. Add concrete <br />pads and coolant lines <br />$1,008.00 <br />13 <br />Maintenance Building — move air compressor to the outside, extend <br />air lines, add 4' x 6' chain link enclosure with metal panel roof <br />$6,296.00 <br />Vehicle Storage — add three overhead doors, delete one personnel <br />14 <br />door, add electrical power, add six painted pipe bollards <br />$26,757.00 <br />OFFICE — Delete safety room, delete masonry and above grade <br />15 <br />concrete, change to normal entry door <br />-$17,680.00 <br />Vehicle Storage — enclose wash bay <br />16 <br />Add sidewalls to metal building, add two overhead doors, add four <br />painted pipe bollards, add electric power, add 4" fiberglass insulation <br />$25,157.00 <br />17 <br />Maintenance Building <br />Go to Ashford formula concrete hardener <br />$3,784.00 <br />18 <br />Maintenance Building and Vehicle Storage <br />Delete galvanized snow bar <br />-$23,236.00 <br />19 <br />Go to 1000 gallon sand filter in lieu of 2000 gallon <br />-$2,800.00 <br />OFFICE —delete two 5A aluminum glass openings and wooden doors <br />20 <br />in 0115 and 0116. Add metal studs and painted gypsum board <br />-$4,416.00 <br />21 <br />Sub Total <br />$866,936.00 <br />$67,117.00 <br />22 <br />0' <br />Agreed to the attached Itamized conditions/ comments <br />Accepted By: <br />M & A Jones Construction <br />Contract <br />By. ��', <br />/1a_>z <br />Title c President Date <br />1 of 5 <br />