Laserfiche WebLink
Batesville Public Works — Value Engineering and Adjustment Items <br />1. Office Building — go to typical Pre -Engineered Metal Building(PEMB) <br />- Delete structural steel, PVC roofing, polyisocyanu rate insulation, metal <br />trim and 16" snap clad roofing <br />- Delete roof drains, celestial glass <br />- Adjust concrete for footings <br />- Adjust metal studs, gypsum board, fiberglass insulation <br />- Add drop ceiling <br />- Adjust HVAC duct and grills, electrical lighting <br />- Delete carpentry trim, eye brows, accent wall <br />- Add metal building with 26 gauge PBR roof panel, 4' overhangs, <br />smooth soffit panels <br />- Use same metal siding <br />DEDUCT $448,097.00 <br />Acceptable with Comments: <br />• Pettit & Pettit— Alternate light fixture schedule shall be submitted for <br />review. Must have similar lumen outputs and emergency capabilities. <br />Architect shall review architectural aesthetic. <br />• ETC - Redesign of Architectural and Structural is necessary. Roof <br />Gutter & Downspout with Concrete Splash Block shall be included <br />2. Maintenance Building and Vehicle Storage <br />- Go to 26 gauge 'PBR' screw down roof panels <br />- Go to 26 gauge 'PBR' wall panels <br />- Delete all roof overhangs <br />- Add seven 4' x 4' door awnings <br />DEDUCT $169,105.00 <br />Acceptable with Comments: <br />• Pettit & Pettit — Adjust lighting to not be above door awnings. <br />• ETC - Roof Gutter & Downspout with Concrete Splash Block shall be <br />included. <br />3. Go to 14' x 14' metal back insulated overhead doors with 6' highlift, <br />electric operator <br />Acceptable. <br />DEDUCT $67,095.00 <br />2of5 <br />