Laserfiche WebLink
4. Use alternate lighting package for the high bay fixtures in Maintenance <br />Building and Vehicle Storage. <br />DEDUCT $12,524.00 <br />Acceptable with Comments: <br />• Pettit & Pettit — Alternate light fixture schedule shall be submitted <br />for review. Must have similar lumen outputs and emergency <br />capabilities. Architect shall review architectural aesthetic. <br />5. Use aluminum panel feeder conductors. <br />DEDUCT $5,656.00 <br />Acceptable with Comment: <br />• Pettit & Pettit — Adjust size to match ampacity of copper. <br />6. Go to 4" vinyl back fiberglass insulation in Maintenance Building and <br />Vehicle Storage. <br />DEDUCT $10,430.00 <br />• Acceptable. <br />7. Landscaping— use $10,000.00 Allowance <br />DEDUCT $12,000.00 <br />• Acceptable. <br />8. Delete stamped concrete between Offices and Maintenance Building. <br />DEDUCT $9,240.00 <br />Acceptable with Comments: <br />• ETC - Replaced with 3000 PSI concrete with 6"x6" W2.9xW2.9 Wire <br />Mesh. <br />9. Delete all the trench drains in the Maintenance Building. <br />DEDUCT $84,657.00 <br />• Acceptable. <br />10. Maintenance Building — delete two showers, add two water closets, add <br />two toilet paper dispensers. <br />ADD $87.00 <br />Acceptable. <br />3of5 <br />